Do you have any question about this error?
Message type: E = Error
Message class: MILL_OC - Messages for order combination
Message number: 086
Message text: Not all operations combined
You want to create an inspection lot for an original order in which not
all operations are combined. This is not permitted. All operations must
be combined.
The system terminates the operation.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
MILL_OC086
- Not all operations combined ?The SAP error message MILL_OC086: Not all operations combined typically occurs in the context of production planning and execution, particularly when dealing with operations in a routing or production order. This error indicates that there is an issue with the combination of operations in a production order or routing, which prevents the system from processing the order as expected.
Causes:
- Incomplete Routing: The routing may not have all the necessary operations defined, or some operations may be missing.
- Operation Conflicts: There may be conflicts between operations, such as overlapping times or incompatible resources.
- Incorrect Order of Operations: The sequence of operations may not be valid, leading to issues in combining them.
- Resource Availability: The resources (machines, tools, etc.) required for the operations may not be available or properly assigned.
- Configuration Issues: There may be configuration settings in the system that prevent the operations from being combined.
Solutions:
- Check Routing: Review the routing for the production order to ensure that all necessary operations are defined and correctly sequenced.
- Validate Operations: Ensure that there are no conflicts between operations, such as overlapping times or incompatible resources.
- Resource Assignment: Verify that all required resources are available and correctly assigned to the operations in the routing.
- Adjust Operation Sequence: If the order of operations is incorrect, adjust it to ensure that it follows the logical sequence required for production.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the error and potential fixes.
- System Configuration: If the issue persists, consult with your SAP administrator or technical team to check for any configuration issues that may be affecting operation combinations.
Related Information:
CO02
(Change Production Order) or CA01
(Create Routing) to review and modify the relevant data.If the problem continues after trying the above solutions, it may be beneficial to engage with SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
MILL_OC085
All operations combined
What causes this issue? You want to create an inspection lot for an original order in which all operations are combined. This is not permitted. At le...
MILL_OC084
Process orders can only be combined on an order by order basis
What causes this issue? You tried to combine a process order by operation. This is not possible.System Response The system issues an error message a...
MILL_OC087
QM-relevant operations are not combined
What causes this issue? The system cannot combine all inspection-relevant operations.System Response The system terminates the operation.How to fix ...
MILL_OC088
Control key & not found
What causes this issue? You want to create an inspection lot for an original order. The system cannot find the control key for one operation.System R...
Click on this link to search all SAP messages.