Do you have any question about this error?
Message type: E = Error
Message class: MILL_OC - Messages for order combination
Message number: 028
Message text: Opn &1: Parallel sequence &2 is split
During combination by operation, you selected the go-to and from
operation in such as way that the parallel sequence would be split as a
result. However, parallel sequences cannot be split.
The system terminates the operation.
Select the go-to and from operation in the master sequence so that the
complete parallel sequence is included in combination by operation, or
remove the start and end operation of the parallel sequence from the
combination.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
MILL_OC028
- Opn &1: Parallel sequence &2 is split ?The SAP error message MILL_OC028, which states "Opn &1: Parallel sequence &2 is split," typically occurs in the context of production planning and scheduling within the SAP system, particularly in the manufacturing module. This error indicates that there is an issue with the parallel processing of operations in a routing or production order.
Cause:
- Routing Configuration: The routing for the production order may have been set up incorrectly, leading to a situation where operations that are supposed to run in parallel are not properly defined.
- Order Splitting: The production order may have been split due to capacity constraints or scheduling issues, causing the parallel operations to be separated.
- Capacity Issues: If the work center does not have enough capacity to handle the parallel operations, the system may split the sequence, leading to this error.
- Incorrect Sequence Definition: The sequence of operations may not be defined correctly in the routing, causing the system to interpret them as non-parallel.
Solution:
- Check Routing: Review the routing for the production order to ensure that the operations are defined correctly for parallel processing. Ensure that the operations are set up to run in parallel and that the sequence is correct.
- Adjust Capacity: If the issue is related to capacity, consider adjusting the capacity of the work center or rescheduling the production order to ensure that the necessary resources are available.
- Review Order Splitting: Check if the production order has been split and, if necessary, consolidate the order or adjust the scheduling parameters to prevent splitting.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling parallel sequences and operations in your version of SAP.
- Contact Support: If the issue persists, consider reaching out to SAP support or your internal SAP team for further assistance.
Related Information:
By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
MILL_OC027
Opn &: Operations were not selected from every order
What causes this issue? You want to combine several orders by operation. If you want to combine orders by operation, in the operation selection you m...
MILL_OC026
Operation &1: More than one operation was selected from order &2
What causes this issue? During combination by operation, you selected more than one operation for an operation. This is not allowed.System Response ...
MILL_OC029
Opn &: Milestone section cannot be split
What causes this issue? You tried to combine individual operations from a milestone segment. However, milestone segments cannot be split.System Respo...
MILL_OC030
No &-operation was selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.