How To Fix MILL_OC025 - Opn &1: Order &2 Opn &3 is after selection end opn &4


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MILL_OC - Messages for order combination

  • Message number: 025

  • Message text: Opn &1: Order &2 Opn &3 is after selection end opn &4

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MILL_OC025 - Opn &1: Order &2 Opn &3 is after selection end opn &4 ?
    The SAP error message MILL_OC025 typically occurs in the context of production planning and order management within the SAP system, particularly in the manufacturing module. This error indicates that there is a mismatch in the order operations, specifically that an operation (Opn &3) is scheduled to occur after the end of the selection period (Opn &4).
    
    Cause: Operation Scheduling Issue: The operation in question (Opn &3) is scheduled to start after the end of the selection period defined for the order (Opn &4). This can happen due to incorrect planning or scheduling of operations in the production order. Data Entry Errors: There may be incorrect data entries in the production order, such as wrong dates or times for operations.
    Configuration Issues: There could be issues with the configuration of the production process or routing that leads to incorrect operation scheduling.
    Solution: Check Operation Dates: Review the operation dates and times in the production order. Ensure that

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant