How To Fix MDRD505 - No automatic determination takes place for method &1.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MDRD - Messages for Delivery Relationships

  • Message number: 505

  • Message text: No automatic determination takes place for method &1.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MDRD505 - No automatic determination takes place for method &1. ?

    The SAP error message MDRD505 ("No automatic determination takes place for method &1.") typically occurs in the context of Material Requirements Planning (MRP) or when dealing with the determination of planning methods in SAP. This error indicates that the system is unable to automatically determine a planning method for a specific material or situation.

    Cause:

    1. Missing Configuration: The planning method specified (indicated by &1 in the error message) may not be configured correctly in the system.
    2. Material Master Data: The material master data may be incomplete or incorrectly maintained, particularly in the MRP views.
    3. Planning Strategy: The planning strategy assigned to the material may not be compatible with the current settings or requirements.
    4. Custom Settings: Custom settings or enhancements in the system may interfere with the automatic determination process.

    Solution:

    1. Check Material Master Data:

      • Go to the material master (transaction code MM03) and check the MRP views. Ensure that all necessary fields are filled out correctly, especially the planning method and strategy.
    2. Review Planning Method Configuration:

      • Check the configuration for the planning method in the Customizing settings (transaction code SPRO). Navigate to the relevant sections for MRP and ensure that the planning methods are defined and active.
    3. Validate Planning Strategy:

      • Ensure that the planning strategy assigned to the material is appropriate for the type of planning you are performing. You may need to adjust the strategy or assign a different one.
    4. Check for Custom Enhancements:

      • If there are any custom enhancements or user exits that might affect the determination of the planning method, review them to ensure they are functioning as intended.
    5. Consult Documentation:

      • Refer to SAP documentation or notes related to the specific planning method and its configuration to ensure compliance with best practices.
    6. Testing:

      • After making changes, perform a test run to see if the error persists. You can use transaction MD01 or MD02 to run MRP and check if the planning method is now determined correctly.

    Related Information:

    • Transaction Codes:

      • MM03 (Display Material Master)
      • SPRO (Customizing)
      • MD01/MD02 (MRP Run)
    • SAP Notes:

      • Check SAP Notes for any known issues or patches related to the specific planning method or MRP functionality.
    • Documentation:

      • SAP Help Portal and other resources can provide additional insights into MRP configuration and planning methods.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in MRP and material planning.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant