How To Fix MDG_BS_ECC_BP_CHECK407 - Supplier &1 uses engineering change number.


MDG_BS_ECC_BP_CHECK407 - Overview

  • Message type: E = Error

  • Message class: MDG_BS_ECC_BP_CHECK - MDG: messages for check on vendor and customer data

  • Message number: 407

  • Message text: Supplier &1 uses engineering change number.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MDG_BS_ECC_BP_CHECK407 - Supplier &1 uses engineering change number. ?
    The SAP error message MDG_BS_ECC_BP_CHECK407 indicates that a supplier (business partner) is associated with an engineering change number (ECN) that is currently active or in use. This error typically arises in the context of Master Data Governance (MDG) when trying to create or modify a business partner that is linked to an engineering change.
    
    Cause: The error occurs because the system has detected that the supplier you are trying to process is linked to an engineering change number. This linkage may prevent certain operations, such as creating or modifying the business partner, due to the active status of the engineering change.
    Solution: To resolve this error, you can take the following steps: Check Engineering Change Status: Verify the status of the engineering change number associated with the supplier. If the engineering change is still active, you may need to complete or deactivate it before proceeding with changes to the supplier. Review Business Partner Data: Ensure that

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author