How To Fix MDC_PROCESS_MSG403 - Split completed; New process &1 created


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MDC_PROCESS_MSG - MDC Process Object Messages

  • Message number: 403

  • Message text: Split completed; New process &1 created

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MDC_PROCESS_MSG403 - Split completed; New process &1 created ?

    The SAP error message "MDC_PROCESS_MSG403 Split completed; New process &1 created" typically occurs in the context of the SAP Multi-Dimensional Consolidation (MDC) process. This message indicates that a split operation has been successfully completed, resulting in the creation of a new process. While this message is not necessarily an error, it can be part of a workflow that may require further attention or action.

    Cause:

    1. Process Splitting: The message is generated when a consolidation process is split into multiple processes. This can happen due to various reasons, such as:

      • The original process has too many entities or data points, leading to performance issues.
      • The system is configured to split processes based on certain criteria (e.g., size, complexity).
    2. Configuration Settings: The behavior of process splitting can be influenced by configuration settings in the MDC system. If the system is set to automatically split processes under certain conditions, this message will appear.

    Solution:

    1. Review Process Configuration: Check the configuration settings for the MDC process to understand why the split occurred. You may want to adjust the settings if the splitting is not desired.

    2. Monitor New Process: After the split, monitor the newly created process (&1) to ensure that it is functioning correctly and that all necessary data is being processed as expected.

    3. Performance Tuning: If the splitting is causing performance issues or if it is not functioning as intended, consider optimizing the process by:

      • Reducing the number of entities in a single process.
      • Adjusting the parameters that control the splitting behavior.
    4. Consult Documentation: Refer to SAP documentation or help resources for more detailed information on process splitting in MDC and best practices for managing consolidation processes.

    5. Contact SAP Support: If you are unsure about the implications of this message or if it is causing issues in your workflow, consider reaching out to SAP support for assistance.

    Related Information:

    • MDC Overview: Understanding the Multi-Dimensional Consolidation process in SAP can provide insights into how data is managed and processed.
    • Performance Monitoring: Tools and techniques for monitoring the performance of consolidation processes can help identify bottlenecks or issues.
    • SAP Notes: Check for any relevant SAP Notes that may address known issues or provide additional guidance related to process splitting in MDC.

    In summary, the message "MDC_PROCESS_MSG403 Split completed; New process &1 created" is informational and indicates that a process has been split successfully. It is important to monitor the new process and review configuration settings to ensure optimal performance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author