Do you have any question about this error?
Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 767
Message text: Profile & is for non-valuated project stock
The profile you entered is reserved for non-valuated project stock.
However, the project stock of the production lot must be valuated.
Therefore, the system uses the project profile of the reference
production lot that you specified.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
MD767
- Profile & is for non-valuated project stock ?The SAP error message MD767 indicates that there is an issue related to the profile for non-valuated project stock. This error typically arises in the context of Material Requirements Planning (MRP) when the system is trying to process project stock that is not valuated.
Cause:
The error message MD767 usually occurs due to one of the following reasons:
Incorrect Configuration: The configuration for the project stock profile may not be set up correctly in the system. This can include missing or incorrect settings in the material master or project profile.
Material Master Settings: The material master record for the item in question may not be configured to allow for non-valuated stock. This can happen if the valuation type is set incorrectly.
Project Profile Settings: The project profile associated with the project may not be configured to handle non-valuated stock properly.
MRP Settings: The MRP settings for the project stock may not be aligned with the requirements for non-valuated stock.
Solution:
To resolve the MD767 error, you can take the following steps:
Check Project Profile Configuration:
- Go to the project profile settings in SAP and ensure that the profile is correctly configured to handle non-valuated project stock.
Review Material Master:
- Access the material master record for the affected material and check the valuation type. Ensure that it is set to allow for non-valuated stock.
Adjust MRP Settings:
- Review the MRP settings for the project stock and ensure that they are correctly configured to support non-valuated stock.
Consult Documentation:
- Refer to SAP documentation or help resources for specific configuration steps related to project stock and MRP settings.
Testing:
- After making the necessary changes, perform a test run to ensure that the error does not occur again.
Consult SAP Support:
- If the issue persists after checking the configurations, consider reaching out to SAP support for further assistance.
Related Information:
MM02
(Change Material), CJ20N
(Project Builder), or OMD0
(Define MRP Area) to access the relevant settings.By following these steps, you should be able to identify and resolve the cause of the MD767 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
MD766
WBS BOM for reference production lot & already exists
What causes this issue? The reference production lot & already has a work breakdown structure BOM (WBS BOM). If you change or delete the <DS:D...
MD765
WBS BOM for production lot & already exists
What causes this issue? Production lot &V1& already has a WBS BOM. If you specify a reference production lot for this production lot, the sys...
MD800
*** Comment **** Check Material Master for APO
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MD801
Check MRP type
What causes this issue? You want to plan the material in the APO system. The MRP type currently set for the material is not for the MRP procedure &qu...
Click on this link to search all SAP messages.