How To Fix MD417 - &1: &2 (V2)


MD417 - Overview

  • Message type: E = Error

  • Message class: MD - Material Requirements Planning (MRP)

  • Message number: 417

  • Message text: &1: &2 (V2)

  • Show details Hide details
  • CAUSE&
    The order proposal BOM was re-exploded in the planning run.

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    System Response

    This information is displayed in the MRP list.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MD417 - &1: &2 (V2) ?
    The SAP error message MD417 typically relates to issues in the Material Requirements Planning (MRP) process, specifically concerning the planning of materials. The message format you provided indicates that it includes two variables, which are usually placeholders for specific details about the error.
    
    Cause: The error message MD417 usually indicates that there is a problem with the planning data for a material. Common causes include: Missing Master Data: The material master data or the BOM (Bill of Materials) might be incomplete or missing. Incorrect MRP Settings: The MRP settings for the material might not be configured correctly. Planning File Entries: There may be issues with the planning file entries that prevent the MRP run from processing correctly. Stock Levels: The stock levels might not meet the requirements for the planned orders or production orders. Dependencies: There could be dependencies or constraints that are not being met, such as lead times or availability of components.
    Solution: To resolve the MD417

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:
  • MD416 &1: &2 (V1)
    What causes this issue? The order proposal was changed in the planning run.System Response This information is displayed in the MRP list.Error messa...

  • MD415 &1: &2 (T4)
    What causes this issue? The finish date of the order proposal lies in the past.System Response This exception is displayed in the MRP list and in th...

  • MD418 &1: &2 &3 (V3)
    What causes this issue? The order proposal was manually changed in the single-item planning run. The system issues an error message and will not allo...

  • MD419 &1: &2 &3 (U1)
    What causes this issue? In the rescheduling check, the system calculated a date to which the receipt is to be brought forward (rescheduled in) to avo...