  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MD329 - Capacity overload for capacity &1 and capacity category &2 in period &3 ?

    The SAP error message MD329 indicates a capacity overload for a specific capacity and capacity category during a given period. This typically occurs in the context of production planning and capacity management within SAP's Advanced Planning and Optimization (APO) or Production Planning (PP) modules.

    Cause:

    1. Capacity Overload: The primary cause of this error is that the planned production or operations exceed the available capacity of a work center or resource for the specified time period. This can happen due to:

      • Increased production orders or demand.
      • Incorrect capacity planning settings.
      • Changes in production schedules or lead times.
      • Unplanned downtimes or maintenance activities.
    2. Incorrect Master Data: Issues with master data, such as incorrect capacity values, working times, or shifts defined for the work center.

    3. Scheduling Conflicts: Overlapping production orders or operations that are scheduled to run simultaneously on the same resource.

    Solution:

    1. Review Capacity Planning:

      • Check the capacity utilization of the affected work center or resource. You can do this using transaction codes like CM01 (Capacity Overview) or CM21 (Capacity Planning).
      • Analyze the planned orders and production orders to see if they exceed the available capacity.
    2. Adjust Production Orders:

      • Reschedule or split production orders to balance the load across available capacities.
      • Consider adjusting the start and end dates of production orders to avoid overlaps.
    3. Modify Capacity Settings:

      • If necessary, adjust the capacity settings for the work center, such as increasing the available capacity or changing the working times.
      • Ensure that the capacity category is correctly defined and that the work center is set up properly.
    4. Check Master Data:

      • Verify the master data for the work center, including available capacity, shift definitions, and any planned downtimes.
      • Ensure that the capacity category is appropriate for the type of work being performed.
    5. Use Alternative Resources:

      • If possible, consider using alternative work centers or resources to alleviate the overload.
    6. Consult with Stakeholders:

      • Engage with production planners, operations managers, and other stakeholders to understand the demand and capacity requirements better.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CM01, CM21, MD04 (Stock/Requirements List), and COHV (Mass Processing of Production Orders).
    • Capacity Planning: Understand the principles of capacity planning in SAP, including how to set up and manage work centers, capacity categories, and production scheduling.
    • Documentation: Refer to SAP documentation and help resources for detailed guidance on capacity management and troubleshooting capacity overload issues.

    By following these steps, you should be able to identify the root cause of the MD329 error and implement appropriate solutions to resolve the capacity overload issue.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant