Do you have any question about this error?
Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 304
Message text: No capacity load exists for the specified work center
No capacity requirements exist from the planned orders in the period
of evaluation.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
MD304
- No capacity load exists for the specified work center ?The SAP error message MD304 "No capacity load exists for the specified work center" typically occurs in the context of production planning and capacity management. This error indicates that the system cannot find any capacity load for the specified work center during the planning process. Here are the potential causes, solutions, and related information for this error:
Causes:
- No Planned Orders or Production Orders: There may be no planned orders or production orders assigned to the work center for the specified time period.
- Incorrect Work Center Configuration: The work center may not be properly configured in the system, or it may not have any capacity defined.
- Capacity Planning Settings: The settings for capacity planning may not be correctly set up, leading to the absence of load data.
- Date Range Issues: The date range specified in the planning run may not include any periods where there is capacity load.
- Work Center Status: The work center may be set to inactive or may have been deactivated for the planning period.
- Missing or Incorrect Master Data: There may be missing or incorrect master data related to the work center, such as routing or bill of materials (BOM).
Solutions:
- Check Planned/Production Orders: Verify that there are planned orders or production orders for the work center in the specified time frame. If not, create the necessary orders.
- Review Work Center Configuration: Ensure that the work center is correctly configured with the necessary capacity data. Check the capacity planning view of the work center.
- Adjust Capacity Planning Settings: Review the settings in the capacity planning configuration to ensure they are set up correctly.
- Verify Date Range: Make sure that the date range you are using for the planning run includes periods where there is expected capacity load.
- Check Work Center Status: Ensure that the work center is active and available for planning. If it is inactive, reactivate it.
- Review Master Data: Check the master data for the work center, including routing and BOM, to ensure that everything is correctly set up and linked.
Related Information:
CR01
(Create Work Center), CR02
(Change Work Center), and CR03
(Display Work Center) to manage work center data.CM01
(Capacity Overview) to analyze capacity loads and identify any discrepancies.By following these steps, you should be able to identify the cause of the MD304 error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
MD303
Please place the cursor on a planned order number
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MD302
Please select a valid field for the display of the pegged capacity
What causes this issue? You can display the pegged orders of the total capacity requirements in a period or those orders for a material that have cap...
MD305
No work centers with capacity requirements were found
What causes this issue? The capacity situation is displayed for all work centers that are affected by the planned orders from the MRP list of the mat...
MD306
Processing terminated by the user
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.