Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 253
Message text: No instance exists for planned order &1 (Please see long text!)
For planned order &v1& with configuration, no valid instance could be
determined.
The BOM for the material could not be exploded.
A possible reason is an inconsistency in the order account assignment
in your system.
For this planned order, please check (if existent)
the corresponding sales order number &v2& and item &v3&.
the WBS element &v4&, for projects.
For an assigned planned order with reference to a sales order, sales
order items have been deleted. As the planned order has been firmed, it
must be deleted manually.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
MD253
- No instance exists for planned order &1 (Please see long text!) ?The SAP error message MD253 "No instance exists for planned order &1" typically occurs in the context of production planning and scheduling. This error indicates that the system cannot find a planned order with the specified order number (represented by &1). Here are the potential causes, solutions, and related information for this error: Causes: Planned Order Deletion: The planned order may have been deleted or not created properly. Incorrect Order Number: The order number you are trying to access may be incorrect or mistyped. Data Synchronization Issues: There may be issues with data synchronization between different modules or systems. Authorization Issues: The user may not have the necessary authorizations to view or access the planned order. Buffer Issues: Sometimes, the system buffer may not be updated, leading to discrepancies in data retrieval. Solutions: Verify Order Number: Double-check the planned order number you are using to ensure it is correct. Check Order Status: Use transaction codes like MD04 (Stock/Requirements List)
Get instant SAP help. Sign up for our Free Essentials Plan.
MD252
Total planning run stopped due to &1 terminations (dumps) of &2 materials
What causes this issue? The total planning run was stopped as out of &V2& materials planned, &V1& were terminated with a runtime erro...
MD251
Please check the destinations for parallel MRP
What causes this issue? No destinations have been entered in Customizing or none of the the destinations (application server) entered are active. In ...
MD260
Error in server group. The system will switch to sequential reading
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MD261
Error with RFCs. The system will switch to sequential reading
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.