Do you have any question about this error?
Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 135
Message text: Replacements in overlapping periods is not possible
Version &V1& is to replace two different versions in the same period.
This is not possible.
In the same period, one version can only replace <ZH>one</> other
version.
Please check your entry.
Error message extract from SAP system. Copyright SAP SE.
MD135
- Replacements in overlapping periods is not possible ?The SAP error message MD135, which states "Replacements in overlapping periods is not possible," typically occurs in the context of Material Requirements Planning (MRP) when there are issues with the replacement of planned orders or stock in overlapping time periods. This error can arise in various scenarios, such as when trying to replace a planned order with another planned order that has a conflicting time frame.
Cause:
- Overlapping Time Periods: The primary cause of this error is that the replacement order you are trying to create overlaps with an existing order or stock in a way that is not allowed by the system.
- Incorrect Configuration: There may be configuration settings in the MRP or in the material master that do not allow for overlapping replacements.
- Planning Parameters: The planning parameters for the material may not be set correctly, leading to conflicts in the scheduling of orders.
- Stock Levels: If there are stock levels that conflict with the planned orders, this can also trigger the error.
Solution:
- Check Order Dates: Review the dates of the planned orders and ensure that they do not overlap. Adjust the dates of the orders if necessary.
- Review MRP Settings: Check the MRP settings for the material in question. Ensure that the settings allow for the type of replacements you are trying to perform.
- Adjust Planning Parameters: If the planning parameters are causing the issue, consider adjusting them to allow for more flexibility in order replacements.
- Use Alternative Solutions: If the replacement is not feasible, consider using alternative solutions such as creating a new order instead of replacing an existing one.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on handling replacements and MRP settings.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in MRP processes.
Get instant SAP help. Start your 7-day free trial now.
MD134
Multi-level replacements are not possible
What causes this issue? You specified that version &V1& is to replace version &V2&. On the other hand, version &V2& is to rep...
MD133
Simulation planned orders cannot be firmed
What causes this issue? The planned order that was selected is a simulative planned order from long-term planning.System Response Planned orders tha...
MD136
Please enter a target version
What causes this issue? The system requires a new version number to create a new operative version.System Response The simulative version is copied ...
MD137
Simulation version &1 cannot be copied to the same version number
What causes this issue? The system requires a new version number to create a new operative version.System Response The simulative version is copied ...
Click on this link to search all SAP messages.