How To Fix MANAGE_ALLOC029 - Base Unit of Measure has to be filled.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MANAGE_ALLOC -

  • Message number: 029

  • Message text: Base Unit of Measure has to be filled.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MANAGE_ALLOC029 - Base Unit of Measure has to be filled. ?
    The SAP error message MANAGE_ALLOC029 indicates that the Base Unit of Measure (BOM) for a material is not filled or defined in the system. This error typically occurs when you are trying to perform a transaction that requires the Base Unit of Measure to be specified, such as during the creation or management of allocations, stock transfers, or inventory management.
    
    Cause: Missing Base Unit of Measure: The material master record for the item you are working with does not have a Base Unit of Measure defined. Incorrect Material Type: The material type may not be set up correctly, or the material may not be configured to allow for the Base Unit of Measure. Data Inconsistency: There may be inconsistencies in the material master data that prevent the Base Unit of Measure from being recognized.
    Solution: To resolve the error, you can follow these steps: Check Material Master Data: Go to the transaction code MM03 (Display Material) or MM02

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker