How To Fix MA451 - Planning type & not yet created


MA451 - Overview

  • Message type: E = Error

  • Message class: MA - Sales and Operations Planning

  • Message number: 451

  • Message text: Planning type & not yet created

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MA451 - Planning type & not yet created ?
    The SAP error message MA451, which states "Planning type & not yet created," typically occurs in the context of Material Requirements Planning (MRP) or other planning-related transactions in SAP. This error indicates that the system is trying to access a planning type that has not been defined or created in the system.
    
    Cause: Missing Planning Type: The planning type specified in the transaction or configuration does not exist in the system. Incorrect Configuration: The planning type may have been incorrectly configured or deleted. Data Entry Error: There may be a typographical error in the planning type being referenced.
    Solution: Check Planning Type Configuration: Go to the configuration settings in SAP (Transaction code: SPRO). Navigate to the relevant section for planning types (usually under "Production Planning" or "Material Requirements Planning"). Verify if the planning type in question exists. If it does not, you may need to create it. Create a New Planning Type: If the planning type is indeed missing, you can

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker