How To Fix MA440 - Planning job created successfully


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MA - Sales and Operations Planning

  • Message number: 440

  • Message text: Planning job created successfully

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MA440 - Planning job created successfully ?

    The SAP error message MA440, which states "Planning job created successfully," is not actually an error message but rather an informational message indicating that a planning job has been successfully created in the system. This message typically appears in the context of Material Requirements Planning (MRP) or other planning-related activities in SAP.

    Cause:

    • The message MA440 is generated when a planning job (such as MRP run, forecast, or other planning activities) is initiated and completed without any issues. It indicates that the job has been scheduled and will run as per the defined parameters.

    Solution:

    Since MA440 is an informational message rather than an error, there is no specific solution required. However, if you are looking to ensure that the planning job runs correctly or to troubleshoot any subsequent issues, consider the following steps:

    1. Check Job Status: After receiving this message, you can check the status of the planning job in transaction code SM37 (Job Monitoring) to ensure it has completed successfully.

    2. Review Job Logs: If you want to verify the details of the planning job, you can review the job logs for any warnings or errors that may have occurred during execution.

    3. Monitor Results: After the planning job has run, check the results to ensure that the planning outputs (such as planned orders, purchase requisitions, etc.) are generated as expected.

    4. Adjust Parameters: If you need to modify the planning job parameters (like planning horizon, planning mode, etc.), you can do so in the relevant configuration or transaction.

    5. Consult Documentation: If you are unsure about the planning job's configuration or need to understand its impact, refer to SAP documentation or consult with your SAP functional team.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as:

      • MD01: MRP Run
      • MD02: MRP Run for Single Material
      • MD03: MRP Run for Single Plant
      • SM37: Job Monitoring
    • SAP Notes: Check SAP Notes for any updates or known issues related to MRP or planning jobs.

    • SAP Community: Engage with the SAP Community for discussions and insights related to planning jobs and MRP processes.

    In summary, MA440 is a positive confirmation that a planning job has been created successfully, and you should follow up by monitoring the job's execution and results.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:
  • MA439 Choose days' supply
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • MA438 Delta planning not supported for this function
    What causes this issue? The function you have tried to carry out is not defined for delta planning, and delta planinng is the planning method of this...

  • MA441 Planning job changed successfully
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • MA442 Planning jobs deleted
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker