Message type: E = Error
Message class: MA - Sales and Operations Planning
Message number: 343
Message text: Caution: overload in period &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MA343
- Caution: overload in period & ?The SAP error message MA343 "Caution: overload in period &" typically occurs in the context of Material Requirements Planning (MRP) or production planning when the system detects that the planned capacity for a work center or production line exceeds the available capacity for a specific period. This can lead to potential scheduling issues and delays in production.
Cause: Capacity Overload: The primary cause of this error is that the total planned workload for a work center exceeds its available capacity during a specific time frame. This can happen due to: High demand for products. Incorrect capacity planning or settings in the work center. Changes in production schedules or unexpected machine downtimes. Incorrectly defined production orders or planned orders. Incorrect Master Data: Issues with master data, such as incorrect capacity values, shift patterns, or working hours for the work center. Scheduling Conflicts: Overlapping production orders or planned orders that are scheduled to run simultaneously on the same work center.
Solution: Review
Get instant SAP help. Sign up for our Free Essentials Plan.
MA342
Generation could not be carried out
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MA341
Reference message type does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MA344
Methods maintenance is currently blocked by user &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MA345
Info structure & not defined for planning
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.