Do you have any question about this error?
Message type: E = Error
Message class: MA - Sales and Operations Planning
Message number: 093
Message text: To date comes before the start of the planning horizon
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MA093
- To date comes before the start of the planning horizon ?The SAP error message MA093 ("To date comes before the start of the planning horizon") typically occurs in the context of Material Requirements Planning (MRP) or similar planning functions within SAP. This error indicates that the date range specified for a planning activity is incorrect, specifically that the "To date" is set earlier than the "From date" or the start of the planning horizon.
Cause:
- Incorrect Date Input: The user may have entered the "To date" incorrectly, making it earlier than the "From date" or the defined planning horizon.
- Planning Horizon Settings: The planning horizon may not be set correctly in the configuration, leading to inconsistencies in date ranges.
- System Configuration: There may be issues with the configuration of the MRP settings or the planning parameters in the system.
Solution:
- Check Date Inputs: Review the dates entered in the planning transaction. Ensure that the "To date" is later than the "From date" and falls within the defined planning horizon.
- Adjust Planning Horizon: If necessary, adjust the planning horizon settings in the configuration. This can typically be done in the MRP settings under the relevant configuration path (e.g., SPRO > Production > MRP > Set MRP Parameters).
- Review MRP Parameters: Ensure that the MRP parameters are set correctly for the materials being planned. This includes checking the planning file and any specific settings related to the material master.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the planning horizon settings and how to adjust them.
Related Information:
If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in MRP and planning processes.
Get instant SAP help. Start your 7-day free trial now.
MA092
Planning type & not defined for info structure &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MA091
From date comes after "to" date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MA094
Target key figure must have the same unit type - choose again
What causes this issue? The target key figure you have specified has a different unit type than the source key figure.System Response The system doe...
MA095
Action & not defined for info structure & version &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.