How To Fix M9085 - From date comes after current planning finish date


M9085 - Overview

  • Message type: E = Error

  • Message class: M9 - Logistics Information System: Planning Data

  • Message number: 085

  • Message text: From date comes after current planning finish date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message M9085 - From date comes after current planning finish date ?
    The SAP error message M9085, which states "From date comes after current planning finish date," typically occurs in the context of materials management or production planning when there is a mismatch between the dates specified in a planning or scheduling operation and the current planning horizon.
    
    Cause: This error usually arises due to one of the following reasons: Date Configuration: The "from date" specified for a planning operation or a production order is set beyond the current planning finish date. This can happen if the planning horizon is not properly defined or if the dates are incorrectly entered. Planning Parameters: The planning parameters in the system may not be set correctly, leading to inconsistencies in the date calculations. Master Data Issues: There may be issues with the master data, such as incorrect validity periods for materials or resources. Changes in Planning: If there have been recent changes in the planning setup or if the planning run

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant