How To Fix M9061 - Specified date lies in current planning horizon


M9061 - Overview

  • Message type: E = Error

  • Message class: M9 - Logistics Information System: Planning Data

  • Message number: 061

  • Message text: Specified date lies in current planning horizon

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message M9061 - Specified date lies in current planning horizon ?
    The SAP error message M9061, which states "Specified date lies in current planning horizon," typically occurs in the context of materials management and production planning. This error indicates that the date you are trying to use for a planning operation (such as creating a production order, purchase order, or similar) is outside the defined planning horizon in the system.
    
    Cause: Planning Horizon Settings: The planning horizon is defined in the system settings and determines the time frame within which planning activities can be performed. If the date you are trying to use falls outside this range, the system will generate this error. Incorrect Date Entry: The date you entered may be incorrect or not aligned with the current planning cycle. Master Data Configuration: The material master or other related master data may not be configured correctly, leading to discrepancies in planning.
    Solution: Check Planning Horizon Settings: Navigate to the configuration settings for the planning horizon in your

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:
  • M9060 Define a currency
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • M9059 Define a unit of measure
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • M9062 Choose one model
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • M9063 Unit will be set to &
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker