How To Fix M7389 - Of the required quantity of material &, & & remain(s) open


SAP Error Message - Details

  • Message type: E = Error

  • Message class: M7 - Inventory Management and Physical Inventory

  • Message number: 389

  • Message text: Of the required quantity of material &, & & remain(s) open

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message M7389 - Of the required quantity of material &, & & remain(s) open ?

    The SAP error message M7389 indicates that there is an issue with the availability of a required quantity of a material in the system. Specifically, it means that there are open requirements for a material that have not been fulfilled, which can occur in various scenarios such as production orders, purchase orders, or stock transfers.

    Cause:

    1. Open Purchase Orders: There may be open purchase orders for the material that have not yet been delivered.
    2. Production Orders: There could be production orders that require the material, but the required quantity has not been produced or is not available in stock.
    3. Stock Shortage: The material may not be available in the required quantity due to stock shortages.
    4. Incorrect Planning: The material requirements planning (MRP) settings may not be correctly configured, leading to discrepancies in the required and available quantities.
    5. Reservation Issues: There may be reservations for the material that are not being fulfilled.

    Solution:

    1. Check Stock Levels: Verify the current stock levels of the material in question using transaction codes like MMBE (Stock Overview) or MB52 (List of Warehouse Stocks on Hand).
    2. Review Open Purchase Orders: Use transaction code ME2N to check for any open purchase orders that may be affecting the availability of the material.
    3. Analyze Production Orders: Check for any production orders that are pending or incomplete using transaction code CO03 (Display Production Order).
    4. Adjust MRP Settings: If the issue is related to planning, review the MRP settings for the material and adjust them as necessary. This may involve running MRP again using transaction code MD02 or MD03.
    5. Check Reservations: Use transaction code MB22 to check for any reservations that may be impacting the availability of the material.
    6. Communicate with Suppliers: If the issue is related to open purchase orders, communicate with suppliers to expedite delivery.
    7. Create Stock Transfers: If necessary, consider transferring stock from other locations if available.

    Related Information:

    • Transaction Codes:
      • MMBE: Stock Overview
      • ME2N: Purchase Orders by PO Number
      • CO03: Display Production Order
      • MD02: MRP Run
      • MB22: Change Reservation
    • Material Master Data: Ensure that the material master data is correctly maintained, including lead times, safety stock levels, and reorder points.
    • MRP Configuration: Review the MRP configuration settings in the system to ensure they align with business requirements.

    By following these steps, you should be able to identify the root cause of the M7389 error and take appropriate actions to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author