Do you have any question about this error?
Message type: E = Error
Message class: M7 - Inventory Management and Physical Inventory
Message number: 382
Message text: Entry quantity of the ordered material in a subcontract order is 0
An entry quantity of <ZH>zero</> for the ordered material of a
subcontract order (end product) was transferred to the
<DS:GLOS.3526B543AFAB52B9E10000009B38F974>BAPI</>
<ZH>BAPI_GOODSMVT_CREATE</> or the
<DS:GLOS.3526B20FAFAB52B9E10000009B38F974>function module</>
<ZH>MB_CREATE_GOODS_MOVEMENT</> to post a goods movement.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
The entry quantity of the end product of a subcontract order must have
a value larger than <ZH>zero</>.
Error message extract from SAP system. Copyright SAP SE.
M7382
- Entry quantity of the ordered material in a subcontract order is 0 ?The SAP error message M7382, which states "Entry quantity of the ordered material in a subcontract order is 0," typically occurs in the context of subcontracting processes within SAP. This error indicates that the system has detected that the quantity of the material being ordered in a subcontracting order is set to zero, which is not valid.
Cause:
- Zero Quantity Entry: The most direct cause of this error is that the quantity field for the material in the subcontract order has been inadvertently set to zero.
- Incomplete Data: The order may not have been fully populated with the necessary data, leading to a zero quantity being saved.
- Incorrect Configuration: There may be issues with the configuration of the material or the subcontracting process in the system.
- Data Transfer Issues: If the order was created through a data transfer process (like an interface), there may have been an error in the data being sent.
Solution:
- Check the Order: Review the subcontract order in question. Ensure that the quantity for the ordered material is correctly entered and is greater than zero.
- Correct the Quantity: If the quantity is indeed zero, update it to the correct value and save the order.
- Review Configuration: If this issue occurs frequently, review the configuration settings for the material and subcontracting processes to ensure they are set up correctly.
- Data Validation: If the order was created through an automated process, validate the data being sent to ensure that it includes the correct quantities.
- Consult Documentation: Refer to SAP documentation or help resources for additional guidance on subcontracting processes and error handling.
Related Information:
If the problem persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in materials management and subcontracting processes.
Get instant SAP help. Start your 7-day free trial now.
M7381
Line with unique identification &1 does not exist
What causes this issue? The system cannot determine the line with the unique identification (field <DS:DE.MB_LINE_ID>LINE_ID</>: Unique i...
M7380
Valuation type & for material & was copied from the info record
What causes this issue? In the purchasing record, the valuation type &V1& for material &V2& is stored for this vendor. If a purchase ...
M7383
Entry quantity of ordered material in a subsequent adjustment is not 0
What causes this issue? An entry quantity that is not <ZH>zero</> for the ordered material (end product) was transferred, during a subseq...
M7384
Subsequent adjustment subcontracting: No components were transferred
What causes this issue? With the <DS:GLOS.3526B543AFAB52B9E10000009B38F974>BAPI</> <ZH>BAPI_GOODSMVT_CREATE</> or the <DS:...
Click on this link to search all SAP messages.