Do you have any question about this error?
Message type: E = Error
Message class: M3 - Material Master
Message number: 652
Message text: Lot size of production version does not match alternative BOM
The lot-size range of the production version is not fully contained in
the lot-size range of the alternative BOM.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
M3652
- Lot size of production version does not match alternative BOM ?The SAP error message M3652, "Lot size of production version does not match alternative BOM," typically occurs in the context of production planning and material management when there is a mismatch between the lot size defined in the production version and the lot size specified in the alternative Bill of Materials (BOM).
Cause:
- Mismatch in Lot Sizes: The lot size defined in the production version does not match the lot size defined in the alternative BOM. This can happen if the production version is set up with a specific lot size that is different from what is defined in the BOM.
- Incorrect Configuration: The production version or the alternative BOM may not be configured correctly, leading to discrepancies.
- Changes in BOM or Production Version: If there have been recent changes to either the BOM or the production version, it may lead to inconsistencies that trigger this error.
Solution:
Check Lot Sizes: Verify the lot sizes defined in both the production version and the alternative BOM. Ensure that they match. You can do this by:
- Navigating to the production version in the SAP system and checking the lot size.
- Checking the alternative BOM for the same material and confirming its lot size.
Adjust Production Version or BOM: If there is a mismatch, you may need to adjust either the production version or the alternative BOM to ensure that they are consistent. This can involve:
- Changing the lot size in the production version to match the alternative BOM.
- Modifying the alternative BOM to match the lot size in the production version.
Review Configuration: Ensure that the configuration for both the production version and the BOM is correct. This includes checking for any settings that may affect lot size determination.
Recreate Production Version: If the issue persists, consider recreating the production version to ensure that it is correctly linked to the appropriate BOM.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on managing production versions and BOMs.
Related Information:
C223
(to display/change production versions) and CS03
(to display BOM) to check the relevant details.By following these steps, you should be able to resolve the M3652 error and ensure that your production planning processes run smoothly.
Get instant SAP help. Start your 7-day free trial now.
M3651
No matching alternative BOM exists
What causes this issue? You have entered an alternative BOM and/or BOM usage, but no bill of material with these values exists for the material.Syste...
M3650
Costing data is only useful if valuation takes place at plant level
What causes this issue? You only maintain costing data if valuation is at plant level. The system issues an error message and will not allow you to c...
M3653
Check the default alternative BOM
What causes this issue? You have done one of the following: Entered an <DS:GLOS.alternative_BOM>alternative bill of material</> (BOM) wit...
M3654
Date of production version does not match alternative BOM
What causes this issue? The production version's area of validity is incompletely contained in the alternative BOM's area of validity.Syste...
Click on this link to search all SAP messages.