How To Fix LSOPV727 - Planning from & to & has been completed


SAP Error Message - Details

  • Message type: E = Error

  • Message class: LSOPV - Training Management (Copy of Message Class PV)

  • Message number: 727

  • Message text: Planning from & to & has been completed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message LSOPV727 - Planning from & to & has been completed ?

    The SAP error message LSOPV727 typically indicates that a planning run has been completed for a specific period, and it is often related to the planning process in SAP's Integrated Business Planning (IBP) or Advanced Planning and Optimization (APO) modules. This message can occur in various contexts, such as during the execution of a planning function or when trying to re-run a planning process for a period that has already been processed.

    Cause:

    1. Planning Period Already Processed: The most common cause of this error is that the planning period you are trying to execute has already been completed. This means that the system has already run the planning process for the specified time frame, and it does not allow for re-execution unless certain conditions are met.
    2. Locking Mechanism: The planning process may be locked due to ongoing processes or settings that prevent re-execution.
    3. Configuration Settings: There may be specific configuration settings in the planning area that restrict re-planning for completed periods.

    Solution:

    1. Check Planning Status: Verify the status of the planning period in question. If it has already been completed, you may need to adjust your planning strategy or choose a different period for planning.
    2. Unlock the Period: If you need to re-run the planning for a completed period, you may need to unlock it. This can typically be done by an administrator or through specific transaction codes that allow for the modification of planning periods.
    3. Adjust Configuration: Review the configuration settings in your planning area to see if there are any restrictions on re-planning. Adjust these settings if necessary, but ensure that you understand the implications of doing so.
    4. Consult Documentation: Refer to SAP documentation or help resources for specific instructions related to your version of SAP and the planning module you are using.
    5. Contact Support: If the issue persists, consider reaching out to SAP support or your internal IT team for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes that may help in managing planning runs, such as /SAPAPO/SDP94 for planning book or /SAPAPO/MC90 for planning area settings.
    • SAP Notes: Check for any SAP Notes related to LSOPV727 for additional insights or patches that may address known issues.
    • User Roles: Ensure that you have the appropriate user roles and permissions to execute planning functions and modify planning periods.

    By following these steps, you should be able to address the LSOPV727 error and continue with your planning activities in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author