Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix LSOPV576 - Enter a schedule that lies within the planning period


SAP Error Message - Details

  • Message type: E = Error

  • Message class: LSOPV - Training Management (Copy of Message Class PV)

  • Message number: 576

  • Message text: Enter a schedule that lies within the planning period

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message LSOPV576 - Enter a schedule that lies within the planning period ?

    The SAP error message LSOPV576 "Enter a schedule that lies within the planning period" typically occurs in the context of production planning or scheduling within the SAP system. This error indicates that the schedule you are trying to enter or modify does not fall within the defined planning period for the relevant planning object (such as a production order, project, or other planning-related entities).

    Cause:

    1. Planning Period Configuration: The planning period may not be set correctly in the system. This could be due to the configuration of the planning parameters or settings in the relevant module (like PP - Production Planning).
    2. Date Range: The dates you are trying to enter for the schedule may be outside the allowed range defined in the planning settings.
    3. Master Data Issues: The master data (like material master, production version, etc.) may not be set up correctly, leading to discrepancies in the planning period.
    4. User Input Error: The user may have mistakenly entered a date that is outside the defined planning horizon.

    Solution:

    1. Check Planning Period Settings:

      • Navigate to the relevant configuration settings in SAP (usually in SPRO) and check the planning period settings for the specific planning object you are working with.
      • Ensure that the planning period is set to encompass the dates you are trying to enter.
    2. Adjust Dates:

      • Review the dates you are trying to enter and ensure they fall within the defined planning period. If necessary, adjust the dates accordingly.
    3. Review Master Data:

      • Check the master data related to the planning object. Ensure that all relevant data is correctly configured and that there are no discrepancies that could affect the planning period.
    4. Consult Documentation:

      • Refer to SAP documentation or help resources for specific guidance on the planning period settings for your version of SAP.
    5. Contact Support:

      • If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    Related Information:

    • Transaction Codes: Depending on the context, you may need to use specific transaction codes to access planning settings or master data (e.g., MD01 for MRP, CO01 for creating production orders).
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • User Training: Ensure that users are trained on the correct procedures for entering schedules and understanding planning periods to minimize errors.

    By following these steps, you should be able to resolve the LSOPV576 error and successfully enter a schedule within the planning period.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker