Do you have any question about this error?
Message type: E = Error
Message class: LSOPV - Training Management (Copy of Message Class PV)
Message number: 414
Message text: No lock period selected
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
LSOPV414
- No lock period selected ?The SAP error message LSOPV414: No lock period selected typically occurs in the context of the SAP Logistics module, particularly when dealing with planning or scheduling activities. This error indicates that the system requires a lock period to be defined for the operation you are trying to perform, but none has been selected.
Cause:
The error can arise due to several reasons:
- Missing Configuration: The lock period may not be configured in the system for the specific planning scenario you are working with.
- User Input Error: The user may have neglected to select a lock period when prompted during a transaction.
- System Settings: The system settings or parameters may not be correctly set up to allow for the selection of a lock period.
Solution:
To resolve the LSOPV414 error, you can take the following steps:
Check Configuration:
- Navigate to the relevant configuration settings in SAP (usually found in the IMG - Implementation Guide).
- Ensure that the lock periods are defined for the planning area or scenario you are working with.
Select Lock Period:
- When prompted, ensure that you select a valid lock period. This may involve going back to the transaction and explicitly choosing a lock period from the available options.
Review User Authorizations:
- Ensure that your user profile has the necessary authorizations to access and select lock periods.
Consult Documentation:
- Refer to the SAP documentation or help files related to the specific module you are working with for additional guidance on lock periods.
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
/SAPAPO/SDP94
(for planning) or others related to your specific planning scenario.By following these steps, you should be able to resolve the LSOPV414 error and proceed with your planning activities in SAP.
Get instant SAP help. Start your 7-day free trial now.
LSOPV413
Error when deleting lock relationship
What causes this issue? Error when deleting the lock relationship.System Response The system issues an error message and will not allow you to conti...
LSOPV412
Resource & unlocked from & to &
What causes this issue? The resource is unlocked in the period specified.System Response The system issues an error message and will not allow you t...
LSOPV415
Resource has been unlocked
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
LSOPV416
There are reservations in the lock period
What causes this issue? The resource is already reserved in the lock period specified.System Response The system issues an error message and will no...
Click on this link to search all SAP messages.