How To Fix LSOPV411 - Resource & locked from & to &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: LSOPV - Training Management (Copy of Message Class PV)

  • Message number: 411

  • Message text: Resource & locked from & to &

  • Show details Hide details
  • What causes this issue?

    The resource was successfully locked in the period specified.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message LSOPV411 - Resource & locked from & to & ?

    The SAP error message LSOPV411, which states "Resource & locked from & to &," typically occurs in the context of production planning or resource management within SAP. This error indicates that a specific resource (such as a machine or work center) is locked for a certain time period, preventing any new operations or scheduling from being performed on that resource during that time.

    Cause:

    1. Resource Locking: The resource is already scheduled for use during the specified time period. This could be due to existing production orders, maintenance activities, or other planned activities.
    2. Incorrect Time Frame: The time frame you are trying to schedule may overlap with an existing lock on the resource.
    3. Configuration Issues: There may be configuration settings in the system that are causing the resource to be locked unnecessarily.

    Solution:

    1. Check Resource Availability: Review the scheduling of the resource in question. You can do this by checking the production orders or maintenance plans that are currently using the resource.
    2. Adjust Scheduling: If the resource is locked due to an existing order, consider rescheduling your operation to a time when the resource is available.
    3. Release Locks: If the lock is due to a temporary situation (like a maintenance task that has been completed), you may need to manually release the lock on the resource.
    4. Consult with Production Planning: If you are unsure why the resource is locked, consult with your production planning team or system administrator to understand the current scheduling and resource allocation.
    5. Review Configuration: If the issue persists, review the configuration settings related to resource locking in SAP to ensure they are set up correctly.

    Related Information:

    • Transaction Codes: You can use transaction codes like CM01 (Capacity Planning) or COHV (Mass Processing of Production Orders) to check the status of resources and production orders.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • Documentation: Refer to SAP documentation on production planning and resource management for more detailed information on how to manage resources effectively.

    If the problem continues after trying these solutions, it may be beneficial to reach out to SAP support for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant