Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix LSOPV348 - There are no resources available during this time period


SAP Error Message - Details

  • Message type: E = Error

  • Message class: LSOPV - Training Management (Copy of Message Class PV)

  • Message number: 348

  • Message text: There are no resources available during this time period

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message LSOPV348 - There are no resources available during this time period ?

    The SAP error message LSOPV348, which states "There are no resources available during this time period," typically occurs in the context of capacity planning or scheduling within SAP's logistics or production planning modules. This error indicates that the system cannot find any available resources (such as machines, work centers, or personnel) to fulfill a specific demand or task during the specified time period.

    Causes:

    1. Resource Unavailability: The resources required for the operation are either fully booked or not scheduled for the requested time.
    2. Capacity Constraints: The capacity of the work center or resource may be insufficient to handle the demand.
    3. Incorrect Time Period: The time period specified in the planning or scheduling request may not align with the availability of resources.
    4. Maintenance or Downtime: Resources may be undergoing maintenance or are otherwise unavailable due to planned downtime.
    5. Configuration Issues: There may be issues with the configuration of the work centers or resources in the system, such as incorrect capacity settings or calendar definitions.

    Solutions:

    1. Check Resource Availability: Review the availability of the resources in the specified time period. You can do this by checking the capacity planning reports or resource calendars.
    2. Adjust Scheduling: If possible, adjust the scheduling of the task to a time when resources are available.
    3. Increase Capacity: If the demand exceeds the available capacity, consider increasing the capacity of the work center or resource, if feasible.
    4. Review Maintenance Schedules: Ensure that any planned maintenance or downtime is correctly reflected in the system and adjust schedules accordingly.
    5. Configuration Review: Check the configuration of the work centers and resources to ensure they are set up correctly, including capacity, calendars, and shifts.
    6. Consult with Planning Team: Collaborate with the production or planning team to understand the demand and resource allocation better.

    Related Information:

    • Transaction Codes: You may use transaction codes like CM01 (Capacity Planning) or CM21 (Capacity Leveling) to analyze resource availability.
    • Reports: Utilize reports such as S031 (Work Center Load) or S032 (Capacity Evaluation) to get insights into resource utilization.
    • Documentation: Refer to SAP documentation or help files for detailed information on capacity planning and scheduling processes.
    • Support: If the issue persists, consider reaching out to your SAP support team or consulting SAP Notes for any known issues or patches related to this error.

    By following these steps, you should be able to identify the cause of the LSOPV348 error and implement a suitable solution.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author