Do you have any question about this error?
Message type: E = Error
Message class: LR - CATS: Cross-Application Time Sheet
Message number: 675
Message text: Unit &1 is not permitted for reporting to the cProject.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
LR675
- Unit &1 is not permitted for reporting to the cProject. ?The SAP error message LR675 indicates that a specific unit of measure (UoM) is not permitted for reporting to the cProject (Collaborative Project Management). This error typically arises when there is a mismatch between the unit of measure used in the project and the units that are allowed or configured in the system for reporting purposes.
Cause:
- Invalid Unit of Measure: The unit of measure being used for the project or the specific transaction is not defined or allowed in the system for reporting to cProjects.
- Configuration Issues: The configuration settings in the SAP system may not include the unit of measure that is being used.
- Data Entry Errors: There may be a mistake in data entry where an incorrect unit of measure was selected.
Solution:
Check Unit of Measure Configuration:
- Go to the configuration settings in SAP and verify the allowed units of measure for the cProject.
- Ensure that the unit of measure you are trying to use is included in the allowed list.
Update Project Settings:
- If the unit of measure is not allowed, you may need to update the project settings to use a valid unit of measure that is permitted for reporting.
Data Entry Correction:
- Review the data entry for the project or transaction that triggered the error. Correct any mistakes related to the unit of measure.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidelines on units of measure and cProject reporting.
Contact SAP Support:
- If the issue persists after checking the configuration and data entry, consider reaching out to SAP support for further assistance.
Related Information:
By following these steps, you should be able to resolve the LR675 error and ensure that the correct units of measure are being used for reporting in your cProject.
Get instant SAP help. Start your 7-day free trial now.
LR674
Error while reading metadata for the cProject detail fields.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
LR673
ALE distribution scenario for cProject contains errors.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
LR676
Customizing error: No "seconds" unit available.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
LR677
cProject &1 &2 is invalid.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.