How To Fix LR675 - Unit &1 is not permitted for reporting to the cProject.


LR675 - Overview

  • Message type: E = Error

  • Message class: LR - CATS: Cross-Application Time Sheet

  • Message number: 675

  • Message text: Unit &1 is not permitted for reporting to the cProject.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message LR675 - Unit &1 is not permitted for reporting to the cProject. ?
    The SAP error message LR675 indicates that a specific unit of measure (UoM) is not permitted for reporting to the cProject (Collaborative Project Management). This error typically arises when there is a mismatch between the unit of measure used in the project and the units that are allowed or configured in the system for reporting purposes.
    
    Cause: Invalid Unit of Measure: The unit of measure being used for the project or the specific transaction is not defined or allowed in the system for reporting to cProjects.
    Configuration Issues: The configuration settings in the SAP system may not include the unit of measure that is being used. Data Entry Errors: There may be a mistake in data entry where an incorrect unit of measure was selected.
    Solution: Check Unit of Measure Configuration: Go to the configuration settings in SAP and verify the allowed units of measure for the cProject. Ensure that the unit of measure you are trying to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker