How To Fix LP126 - Project stock requires specification of PSP element in WM


LP126 - Overview

  • Message type: E = Error

  • Message class: LP - WM-PP interface

  • Message number: 126

  • Message text: Project stock requires specification of PSP element in WM

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message LP126 - Project stock requires specification of PSP element in WM ?
    The SAP error message LP126 ("Project stock requires specification of PSP element in WM") typically occurs in the context of Warehouse Management (WM) when dealing with project stock. This error indicates that the system requires a Project System (PSP) element to be specified for the stock that is being managed in the warehouse.
    
    Cause: The error is triggered when: You are trying to manage project stock in a warehouse, but the system does not have the necessary Project System (PSP) element specified. The material being processed is set up for project stock, but the relevant PSP element (such as a WBS element) is not provided in the transaction. The configuration in the system may not be set up correctly to handle project stock in the context of warehouse management.
    Solution: To resolve the LP126 error, you can take the following steps: Specify the PSP Element: When creating or processing the stock, ensure that you specify the relevant PSP element

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker