Message type: E = Error
Message class: LP - WM-PP interface
Message number: 112
Message text: Storage bin not clear for material &1, prod.supply area &2, plant &3
The <GL:storage_bin>storage bin</> in the control cycle cannot be
determined due to missing data (warehouse number, storage type, bin).
Therefore it is not possible to view the quantity for the production
storage bin nor is it possible to retrieve it as a
<DS:DE.LVS_D0002>destination storage bin</> in the
<GL:transfer_requirement>transfer requirement</>.
Maintain the control cycle for material &V1&, production supply area
&V2& and plant &V3& with storage bin coordinates.
Error message extract from SAP system. Copyright SAP SE.
LP112
- Storage bin not clear for material &1, prod.supply area &2, plant &3 ?The SAP error message LP112 indicates that there is an issue with a storage bin not being clear for a specific material, production supply area, and plant. This error typically arises in the context of warehouse management and inventory management processes, particularly when trying to perform operations such as stock transfers, inventory counts, or production supply.
Cause: The error message LP112 can be triggered by several factors, including: Stock in the Storage Bin: The storage bin specified in the error message still contains stock, which prevents the system from processing the requested operation. Incorrect Configuration: There may be configuration issues related to the storage bin, material, or production supply area. Open Inventory Documents: There might be open inventory documents or transactions that are preventing the storage bin from being cleared. Pending Transfers: There could be pending transfer orders or other transactions that are linked to the storage bin.
Solution: To resolve the LP112 error, you can take the
Get instant SAP help. Sign up for our Free Essentials Plan.
LP111
Material &1 in prod.supply area &2 is defined as release part in plant &3
What causes this issue? Material &V1& is defined in production supply area &V2& in plant &V3& as a <GL:release_order>re...
LP110
Mat.&1 in prod.supply area &2 is being picked in plant &3 for prod.order
What causes this issue? Based on information in the contol cycle, material &V1& will be picked directly for the production order from product...
LP113
Request for container quantity zero is not appropriate
What causes this issue? During provision of kanban parts, the system is to create a <GL:transfer_requirement>transfer requirement</> for ...
LP114
No control cycle defined for material &1, prod.supply area &2 in plant &3
What causes this issue? There is no control cycle for material &V1& in production supply area &V2& in plant &V3&.How to fix t...
Click on this link to search all SAP messages.