Do you have any question about this error?
Message type: E = Error
Message class: LD - Logistics Automotive Line Design
Message number: 259
Message text: Rate entered is greater than the maximum rate for the production line
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
LD259
- Rate entered is greater than the maximum rate for the production line ?The SAP error message LD259, which states "Rate entered is greater than the maximum rate for the production line," typically occurs in the context of production planning and execution within the SAP system. This error indicates that the rate you are trying to enter for a production order or operation exceeds the maximum allowable rate defined for that specific production line.
Cause:
- Configuration Settings: The maximum rate for the production line may have been set too low in the configuration settings of the production line or work center.
- Data Entry Error: The rate being entered may be incorrect due to a typographical error or misunderstanding of the required input.
- Changes in Production Parameters: If there have been recent changes to the production process or equipment, the maximum rate may need to be updated accordingly.
- Master Data Issues: The master data for the production line or work center may not be correctly maintained, leading to discrepancies in the expected rates.
Solution:
Check Maximum Rate Configuration:
- Navigate to the work center or production line configuration in SAP (Transaction code: CR01 or CR02).
- Verify the maximum rate set for the production line and adjust it if necessary to accommodate the rate you are trying to enter.
Review Data Entry:
- Double-check the rate you are entering for any typographical errors.
- Ensure that you are using the correct units of measure and that the rate is appropriate for the operation being performed.
Update Master Data:
- If there have been changes in the production process, ensure that the master data for the work center or production line reflects these changes.
- Update any relevant parameters that may affect the maximum rate.
Consult Documentation:
- Review any relevant documentation or guidelines related to production rates and configurations to ensure compliance with company policies.
Engage with IT or SAP Support:
- If you are unable to resolve the issue, consider reaching out to your IT department or SAP support team for assistance. They may have additional insights or access to system logs that can help diagnose the problem.
Related Information:
By following these steps, you should be able to identify the cause of the LD259 error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
LD258
Unit &1 cannot be converted into unit &2 of the production line
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
LD257
Error during conversion &1 in base unit of measure &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
LD260
Period overlaps have been adjusted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
LD261
No unit of measure has been maintained for line hierarchy &1
What causes this issue? You have not given the unit of measure of the line hierarchy on the line hierarchy tab page <LS>planned rates</>....
Click on this link to search all SAP messages.