Message type: E = Error
Message class: LD - Logistics Automotive Line Design
Message number: 066
Message text: Division by 0 in scheduling formula in op. &1, seq. &2, grp &3, alt. &4
Operation time cannot be calculated.
Please check the routing.
Error message extract from SAP system. Copyright SAP SE.
LD066
- Division by 0 in scheduling formula in op. &1, seq. &2, grp &3, alt. &4 ?The SAP error message LD066 "Division by 0 in scheduling formula in op. &1, seq. &2, grp &3, alt. &4" typically occurs in the context of production planning and scheduling when the system attempts to perform a calculation that involves division by zero. This can happen in various scenarios, such as when calculating lead times, capacity, or other scheduling-related metrics.
Cause:
- Zero Values: The most common cause of this error is that one of the values used in the scheduling formula is zero. This could be a duration, quantity, or any other parameter that is part of the calculation.
- Missing Data: Required data for the operation, such as setup times, processing times, or resource availability, may be missing or incorrectly configured.
- Incorrect Formula: The scheduling formula itself may be incorrectly defined or not applicable for the specific operation or sequence.
- Configuration Issues: There may be issues with the configuration of the routing, work center, or production version that lead to invalid calculations.
Solution:
- Check Input Values: Review the values used in the scheduling formula for the specified operation, sequence, group, and alternative. Ensure that none of the values are zero or missing.
- Review Routing and Work Center: Check the routing and work center settings to ensure that all necessary times (setup, processing, etc.) are correctly defined and not set to zero.
- Adjust Scheduling Formula: If the formula is custom or modified, review it to ensure it is correctly set up to handle cases where certain values might be zero.
- Data Consistency: Ensure that all relevant master data (materials, BOMs, routings, etc.) is consistent and correctly maintained.
- Error Logs: Check the SAP error logs for additional details that might provide more context about the error.
- Testing: If changes are made, test the scheduling process again to ensure that the error does not recur.
Related Information:
CO02
(Change Production Order) or MD04
(Stock/Requirements List) to investigate the specific operation and its parameters.If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning.
Get instant SAP help. Start your 7-day free trial now.
LD065
Field overflow in scheduling formula in op. &1, seq. &2, grp &3, alt. &4
System Response Oepration time cannot be calculated.How to fix this error? Please check the routing.Error message extract from SAP system. Copyright...
LD064
Op. &1 in sequence &2 in the routing group &3 altern. &4 not found
System Response Operation duration cannot be calculated.How to fix this error? Check the routing.Error message extract from SAP system. Copyright SA...
LD067
Error in operation &1, sequence &2 of routing group &3 altern. &4
System Response Operation time cannot be calculated.How to fix this error? Please check the routing.Error message extract from SAP system. Copyright...
LD070
Selection not possible as value area too large
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.