Do you have any question about this error?
Message type: E = Error
Message class: LC - Logistics Controlling
Message number: 229
Message text: MRP type can only be specified for plant
MRP type is managed at plant level. A purchasing or sales organization
may include several plants. It is therefore not possible to allocate
one MRP type to every one material. The same applies to analyses that
cumulate values per material across all plants.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
LC229
- MRP type can only be specified for plant ?The SAP error message LC229 indicates that there is an issue with the configuration of the Material Requirements Planning (MRP) type for a material in a specific plant. This error typically arises when the MRP type is not correctly assigned or is missing for the material in the plant-specific data.
Cause:
- Missing MRP Type: The MRP type has not been defined for the material in the plant-specific data.
- Incorrect Configuration: The MRP type may be incorrectly configured or not applicable for the material in the specified plant.
- Material Master Data Issues: The material master record may not have been fully maintained for the plant, leading to missing or incorrect data.
Solution:
To resolve the LC229 error, follow these steps:
Check Material Master Data:
- Go to the transaction code
MM02
(Change Material) orMM03
(Display Material).- Enter the material number and select the relevant plant.
- Navigate to the MRP view (usually view 1 or 2) and check if the MRP type is specified.
Assign MRP Type:
- If the MRP type is missing, you need to assign a valid MRP type for the material in the plant.
- Common MRP types include:
- PD (MRP)
- VB (Reorder Point Planning)
- ND (No MRP)
- Choose the appropriate MRP type based on your planning requirements.
Save Changes: After making the necessary changes, save the material master record.
Check MRP Configuration:
- Ensure that the MRP type you are trying to assign is valid and configured correctly in the system.
- You can check the configuration in the transaction code
SPRO
under:
- Logistics -> Production -> Material Requirements Planning -> Master Data -> Define MRP Types.
Re-run MRP: After correcting the material master data, re-run the MRP process to see if the error persists.
Related Information:
By following these steps, you should be able to resolve the LC229 error and ensure that your material is correctly set up for MRP in the specified plant.
Get instant SAP help. Start your 7-day free trial now.
LC228
Purchasing group can only be specified for plant
What causes this issue? The purchasing group is managed at plant level. A purchasing or sales organization may include several purchasing groups. It ...
LC227
ABC indicator can only be specified for plant
What causes this issue? The ABC indicator is managed at plant level. A purchasing organization or sales organization may include several plants. It i...
LC230
MRP controller can only be specified for plant
What causes this issue? The MRP controller is set at plant level. A purchasing or sales organization may include several plants. It is therefore not ...
LC231
Ranking list definition: choose value between 0 and 100
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.