How To Fix L6121 - CPIC error while receiving R/2 queue via IMSASYNC


SAP Error Message - Details

  • Message type: E = Error

  • Message class: L6 - LVS Link R/2 - ECC

  • Message number: 121

  • Message text: CPIC error while receiving R/2 queue via IMSASYNC

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message L6121 - CPIC error while receiving R/2 queue via IMSASYNC ?

    The SAP error message L6121, which indicates a CPIC (Common Programming Interface for Communications) error while receiving R/2 queue via IMSASYNC, typically arises in environments where SAP systems are integrated with IBM's IMS (Information Management System) for asynchronous communication. This error can occur due to various reasons, and understanding the cause and potential solutions is essential for troubleshooting.

    Causes of L6121 CPIC Error

    1. Network Issues: Problems with the network connection between the SAP system and the IMS system can lead to communication failures.

    2. Configuration Errors: Incorrect configuration settings in either the SAP or IMS system can result in CPIC errors. This includes issues with the connection parameters, such as the destination, user credentials, or communication protocols.

    3. Resource Availability: If the IMS system is overloaded or if there are insufficient resources (like memory or processing power), it may not be able to handle incoming requests, leading to CPIC errors.

    4. Queue Management Issues: Problems with the message queues, such as corruption or mismanagement of the queues, can also trigger this error.

    5. Version Compatibility: Incompatibility between the versions of SAP and IMS can lead to communication issues.

    Solutions to L6121 CPIC Error

    1. Check Network Connectivity: Ensure that there is a stable network connection between the SAP and IMS systems. Use tools like ping or traceroute to diagnose network issues.

    2. Review Configuration Settings: Verify the configuration settings in both the SAP and IMS systems. Check the connection parameters, including the destination, user credentials, and any relevant communication settings.

    3. Monitor System Resources: Check the performance and resource utilization of the IMS system. If it is under heavy load, consider optimizing the system or increasing its resources.

    4. Queue Management: Investigate the status of the message queues. Ensure that they are functioning correctly and that there are no issues with message processing.

    5. Check Logs: Review the logs in both the SAP and IMS systems for any additional error messages or warnings that could provide more context about the issue.

    6. Update Software: Ensure that both the SAP and IMS systems are running compatible versions. If necessary, apply patches or updates to resolve compatibility issues.

    7. Consult Documentation: Refer to SAP and IMS documentation for specific troubleshooting steps related to CPIC errors and IMSASYNC communication.

    8. Contact Support: If the issue persists after trying the above solutions, consider reaching out to SAP support or your IMS support team for further assistance.

    Related Information

    • CPIC Documentation: Familiarize yourself with the CPIC programming interface and its error handling mechanisms.
    • SAP Notes: Check SAP Notes for any known issues or patches related to CPIC errors and IMS integration.
    • IMS Documentation: Review IBM's IMS documentation for best practices in configuring and managing IMS systems.

    By systematically addressing these areas, you can often resolve the L6121 CPIC error and restore proper communication between your SAP and IMS systems.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker