Message type: E = Error
Message class: KZ - Cost Object Repetitive Mfg / Process Mfg
Message number: 091
Message text: Material & is already assigned without production process
You are attempting to assign a material (or the combination material/
<DS:GLOS.3559911290FA5063E10000009B38F984>production process</>) to a
<DS:GLOS.3526B6C8AFAB52B9E10000009B38F974>cost object node</>. However,
the material (or the combination material/production process) has
already been assigned to another cost object node.
INCLUDE NAKZ091
Enter a different object.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message KZ091 indicates that a material is already assigned to a production process, but there is an attempt to assign it again or to perform an operation that is not allowed because of this existing assignment. This typically occurs in the context of production planning and control, particularly when dealing with production orders, material requirements planning (MRP), or similar processes.
Cause: Duplicate Assignment: The material is already linked to a production process or order, and the system does not allow reassigning it to another process without first removing the existing assignment. Incorrect Configuration: There may be configuration issues in the production process or material master data that prevent the system from recognizing the current assignment correctly. Status Issues: The material or production order may be in a status that does not allow further assignments or changes. Data Integrity Issues: There could be inconsistencies in the database or master data that lead to
Get instant SAP help. Sign up for our Free Essentials Plan.
KZ090 ============== Single Objects Cost Object Hierarchy (Cont'd at 650) =====
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KZ089 & is not a CO product group
What causes this issue? Although the <DS:GLOS.cost_object_ID>cost object ID</> you entered does exist in the system, it is not a <DS:G...
KZ092 Material & requires an alternative routing
What causes this issue? You have not specified an alternative routing for material &V1&. This material has already been assigned to a cost ob...
KZ093 Material & requires a production version
What causes this issue? You have not specified a production version for material &V1&. This material has already been assigned to a cost obje...
Click on this link to search all SAP messages.