Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: KW - CO-ABC Activity-Based Costing
Message number: 375
Message text: Order type &1 not supported in Activity Based Costing.
You called a process allocation for order &V2& via the template. The
order has order category &V1&. Unfortunately, this order category is
currently not supported yet.
Processing for this order is not carried out.
Select another order or another allocation procedure for this order.
Error message extract from SAP system. Copyright SAP SE.
KW375
- Order type &1 not supported in Activity Based Costing. ?The SAP error message KW375 indicates that the order type specified in the transaction is not supported for Activity Based Costing (ABC). This typically occurs when you are trying to use an order type that is not configured to work with the ABC functionality in SAP.
Cause:
- Order Type Configuration: The order type you are trying to use is not set up to be compatible with Activity Based Costing. This could be due to the order type not being defined in the system for ABC or it being excluded from ABC processing.
- System Settings: The system settings or parameters for Activity Based Costing may not include the specific order type you are trying to use.
- Master Data Issues: There may be issues with the master data related to the order type, such as missing or incorrect settings.
Solution:
Check Order Type Configuration:
- Go to the configuration settings for order types in SAP (Transaction code: OPL8 or SPRO).
- Navigate to the relevant section for Activity Based Costing and ensure that the order type in question is included in the configuration for ABC.
Modify Order Type Settings:
- If the order type is not configured for ABC, you may need to modify the settings to include it. This may involve working with your SAP configuration team or a functional consultant.
Use a Different Order Type:
- If the order type cannot be configured for ABC, consider using a different order type that is supported for Activity Based Costing.
Check Master Data:
- Ensure that all relevant master data (such as cost centers, activity types, etc.) is correctly set up and linked to the order type.
Consult Documentation:
- Review SAP documentation or help resources for more details on configuring order types for Activity Based Costing.
Related Information:
If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP Controlling (CO) and Activity Based Costing.
Get instant SAP help. Sign up for our Free Essentials Plan.
KW374
Incorrect parameter entry for function &
What causes this issue? Parameter &V2& of function &V1& is a parameter of category 'L', that is, a function based on a tabl...
KW373
Column has no corresponding entry
What causes this issue? The column with function &V1& does not have a respective entry.System Response The system issues an error message an...
KW376
Messages from: &1.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KW377
No flexible function &1 found.
What causes this issue? Either no name of a flexible function was found in the selected row or there is no flexible function with the name &V1&am...
Click on this link to search all SAP messages.