Do you have any question about this error?
Message type: E = Error
Message class: KV - Variance Analysis for Cost Centers and Cost Objects
Message number: 890
Message text: Start date is in the past
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
KV890
- Start date is in the past ?The SAP error message KV890, which states "Start date is in the past," typically occurs when you are trying to create or modify a record (such as a contract, order, or project) that has a start date set to a time that is earlier than the current date. This can happen in various modules, including Sales and Distribution (SD), Project System (PS), or others where date management is critical.
Cause:
- Incorrect Date Entry: The most common cause is that the user has inadvertently entered a start date that is earlier than the current date.
- System Settings: In some cases, system settings or configurations may enforce rules that prevent the creation of records with past dates.
- Business Logic: Certain business processes may require that records cannot be backdated for compliance or operational reasons.
Solution:
- Check the Date: Verify the start date you are trying to enter. Ensure that it is set to today’s date or a future date.
- Modify the Record: If you are editing an existing record, change the start date to a valid future date.
- Consult Documentation: Review any relevant documentation or guidelines for the specific module you are working in to understand the date constraints.
- User Authorization: Ensure that you have the necessary permissions to create or modify records with the specified dates.
- System Configuration: If you believe the error is due to system settings, consult with your SAP administrator or technical team to review the configuration related to date handling.
Related Information:
If the issue persists after checking the above points, it may be beneficial to reach out to your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
KV889
Error when locking the request report
What causes this issue? The request report cannot currently be locked.System Response The system issues an error message and will not allow you to c...
KV888
If you start immediately, the planned start date is ignored
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KV891
Processing was ended without job scheduling
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KV892
Enter a start date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.