Do you have any question about this error?
Message type: E = Error
Message class: KV - Variance Analysis for Cost Centers and Cost Objects
Message number: 178
Message text: The version is not intended for WIP calculation
The version is not intended for <DS:GLOS.WIP_calculation>WIP
calculation</>.
The system cannot calculate work in process in the version.
Go to the central version maintenance in Customizing and turn on the
<LS>WIP/RA</> indicator for the version, or choose a version that is
intended for WIP calculation.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
KV178
- The version is not intended for WIP calculation ?The SAP error message KV178, which states "The version is not intended for WIP calculation," typically occurs in the context of Work in Progress (WIP) calculations in SAP, particularly in the Controlling (CO) module. This error indicates that the version you are trying to use for WIP calculation is not set up correctly or is not intended for that purpose.
Cause:
- Incorrect Version Configuration: The version you are using for WIP calculation may not be configured to allow WIP calculations. In SAP, versions are used to define different scenarios for planning and reporting, and not all versions are suitable for WIP calculations.
- Version Not Active: The version might not be active or might not have been set up properly in the system.
- Authorization Issues: There may be authorization issues preventing the use of the version for WIP calculations.
Solution:
Check Version Settings:
- Go to the configuration settings for versions in SAP (Transaction code: OKV0).
- Ensure that the version you are trying to use is marked for WIP calculations. You may need to create a new version or modify an existing one to include WIP calculation settings.
Activate the Version:
- If the version is not active, activate it. This can usually be done in the same configuration area where you check the version settings.
Review WIP Calculation Settings:
- Ensure that the WIP calculation settings are correctly configured in the controlling area. This includes checking the settings for the relevant controlling area and ensuring that the version is included in the WIP calculation parameters.
Check Authorizations:
- Ensure that the user has the necessary authorizations to perform WIP calculations with the specified version. This may involve checking user roles and authorizations in the SAP system.
Consult Documentation:
- Refer to SAP documentation or help resources for specific details on how to configure versions for WIP calculations.
Related Information:
If the problem persists after checking these areas, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP Controlling.
Get instant SAP help. Start your 7-day free trial now.
KV177
The target cost version is not intended for variance calculation
What causes this issue? The version is not indended for <DS:GLOS.variance_calculation>variance calculation</>.System Response The system...
KV176
Cannot calculate target costs
What causes this issue? The target costs could not be calculated due to an error in the application.System Response The system issues an error messa...
KV179
Routing/master recipe for order: & & - material: & &
What causes this issue? This message tells you which quantity structure was used by the cost estimate on which the calculation of target costs is bas...
KV180
No calculation of target costs in version & for fixed-price co-products
What causes this issue? With fixed-price co-products, <DS:GLOS.variance>variances</> are only calculated in <DS:GLOS.target_cost_versi...
Click on this link to search all SAP messages.