Message type: E = Error
Message class: KV - Variance Analysis for Cost Centers and Cost Objects
Message number: 159
Message text: Reporting point/operation &: WIP cannot be negative
The quantity delivered exceeds the quantity confirmed at the reporting
points in this period.
The <DS:GLOS.work_in_process>work in process</> which the system
created for the confirmed quantity was canceled on the basis of the
quantity of goods delivered. Because the quantity of goods delivered
exceeds the confirmed quantity, the system canceled more work in
process than it originally created.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check the reporting point quantity for transaction &v1& and confirm
again if necessary.
Error message extract from SAP system. Copyright SAP SE.
KV159
- Reporting point/operation &: WIP cannot be negative ?The SAP error message KV159 ("Reporting point/operation &: WIP cannot be negative") typically occurs in the context of production order processing, particularly when dealing with Work in Progress (WIP) calculations. This error indicates that the system has detected a situation where the WIP amount for a particular operation or reporting point is being calculated as negative, which is not permissible.
Causes:
- Incorrect Data Entry: There may be incorrect or incomplete data entered in the production order, such as negative quantities or incorrect reporting of completed operations.
- Order Status: The production order might be in a status that does not allow for further processing, such as being closed or technically completed.
- WIP Calculation Issues: The WIP calculation logic may be flawed due to incorrect settings or configurations in the system.
- Material Movements: There may have been material movements (goods issues or receipts) that were not properly accounted for, leading to discrepancies in the WIP calculation.
- Incorrectly Defined Operations: The operations defined in the routing may not align with the actual production process, leading to incorrect WIP calculations.
Solutions:
- Check Production Order Data: Review the production order for any incorrect entries, especially in terms of quantities and statuses. Ensure that all operations are correctly reported.
- Review Order Status: Ensure that the production order is in a valid status for processing. If it is closed or technically completed, you may need to reopen it or adjust the status.
- Adjust WIP Calculation Settings: If the issue persists, review the configuration settings related to WIP calculations in the system. This may involve checking the settings in the controlling area or the relevant production settings.
- Correct Material Movements: Verify that all material movements related to the production order have been properly recorded. Make any necessary adjustments to ensure that the inventory levels are accurate.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling WIP issues and error messages.
- Contact SAP Support: If the issue cannot be resolved through the above steps, consider reaching out to SAP support for further assistance.
Related Information:
By following these steps, you should be able to identify the root cause of the KV159 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
KV158
Routing/master recipe in actuals differs from qty structure for target
What causes this issue? You are attempting to do the following: Calculate work in process at target costs Calculate variances You may also be attempt...
KV157
Order has no or faulty planned costs or overhead
What causes this issue? You are attempting to do one of the following: Calculate <DS:GLOS.work_in_process>work in process</> according to...
KV160
Material: &. Conversion from & to base unit of measure not possible (&)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KV161
WIP or scrap calculation for parallel operation sequences not possible
What causes this issue? If the routing specifies a sequence of operations that are defined as a parallel sequence, this will have the following effec...
Click on this link to search all SAP messages.