How To Fix KV154 - No standard cost estimate for material & in plant & on &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: KV - Variance Analysis for Cost Centers and Cost Objects

  • Message number: 154

  • Message text: No standard cost estimate for material & in plant & on &

  • Show details Hide details
  • What causes this issue?

    You are using a function that calculates the target costs in the current
    standard cost estimate for the material. Using this information, the
    system can calculate the following data:
    Work in process (WIP) for the confirmed WIP quantities
    Scrap for the confirmed scrap quantities
    Variances between the target costs and the control costs
    However, the cost estimate for material &v1& in plant &v2& is:
    Missing
    Not released
    Not valid on &v3&
    Not saved as an itemization
    Not valid at the time WIP or variances were calculated
    Not saved in the controlling area currency
    This can be the case when the controlling area currency is not the same
    as the company code currency. Since variances are always calculated in
    the controlling area currency, the cost estimate must be saved in
    controlling area currency (refer to "Procedure").
    The settlement type in the order determines at which point the cost
    estimate has to be valid.
    For the full settlement, the variances are determined across the entire
    term of the order. In this instance, the cost estimate must be valid on
    the final day of delivery (status DLV), or if this has not yet happened,
    on the day of technical completion (status TECO), or else on the day the
    order was created.
    For the periodic settlement, the variances are calculated for the
    period. In this case, the cost estimate has to be valid on the last day
    of the period.
    If target costs are calculated directly in a report, the cost estimate
    must be valid on the last day of the reporting timeframe.
    Note that you can only valuate work in process and scrap at target costs
    using a product cost estimate with quantity structure. A unit cost
    estimate cannot be used to valuate work in process and scrap.

    System Response

    The absence of target costs has the following effects:
    The system cannot display a report on the target costs.
    The system cannot split the difference between the target costs and the
    control costs by variance categories for the variance calculation.
    The difference is updated as a remaining variance.
    The system cannot valuate the scrap and work in process.

    How to fix this error?

    If you want to calculate input quantity variances, resource-usage
    variances, and so on, proceed as follows:
    If the cost estimate was previously not saved in the controlling area
    currency, you need to carry out the step <LS>Activate Cost Component
    Split in Controlling Area Currency</> in Customizing for <LS>Product
    Cost Planning</>, before you create a new cost estimate. To navigate to
    the step, choose the <LS>Maintain Entries</> (pencil icon) below the
    message text.
    Check the validity dates of the cost estimate.
    <DS:TRAN.CK13N>Proceed</>
    Check the costing view in the master record of the material being
    manufactured. <DS:TRAN.MM03>Proceed</>
    Release the cost estimate for the material if necessary.
    <DS:TRAN.CK24>Proceed</>
    Create a new cost estimate for the material, and save the cost estimate
    in itemized form by turning on the <LS>Itemization</> field in the <LS>
    Update parameters</> dialog box. <DS:TRAN.CK11N>Proceed</>
    Calculate the WIP or variances again.
    If you are working in reporting, select a report that does not refer to
    the target costs.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KV154 - No standard cost estimate for material & in plant & on & ?

    The SAP error message KV154 "No standard cost estimate for material & in plant & on &" typically occurs when the system is unable to find a valid standard cost estimate for a specific material in a given plant. This can happen for several reasons, and understanding the cause is essential for resolving the issue.

    Causes:

    1. Missing Standard Cost Estimate: The most common reason for this error is that a standard cost estimate has not been created for the material in the specified plant.
    2. Costing Version: The costing version being used may not have a valid standard cost estimate for the material.
    3. Plant-Specific Settings: The material may not be set up correctly in the plant, or it may not be assigned to the correct valuation area.
    4. Inactive Cost Estimate: The standard cost estimate may exist but is inactive or not marked as the current version.
    5. Material Type: The material type may not support standard costing, or it may be configured incorrectly.

    Solutions:

    1. Create a Standard Cost Estimate:

      • Go to the transaction code CK11N (Create Cost Estimate with Quantity Structure) to create a new standard cost estimate for the material in the specified plant.
      • Ensure that all necessary data (e.g., BOM, routing) is available and accurate.
    2. Check Costing Version:

      • Verify that you are using the correct costing version. You can check this in the transaction code OKKN (Maintain Costing Versions).
      • Ensure that the costing version you are using is active and has the necessary cost estimates.
    3. Review Material Master Data:

      • Check the material master data using transaction code MM03 (Display Material) to ensure that the material is correctly set up in the specified plant.
      • Verify that the valuation area is set correctly and that the material is assigned to the correct valuation class.
    4. Activate Cost Estimate:

      • If a cost estimate exists but is inactive, you can activate it using transaction code CK24 (Release Cost Estimate).
    5. Consult with Finance/Controlling Team:

      • If you are unsure about the costing setup or if there are specific configurations required for your organization, consult with your finance or controlling team for guidance.

    Related Information:

    • Transaction Codes:

      • CK11N: Create Cost Estimate with Quantity Structure
      • CK24: Release Cost Estimate
      • MM03: Display Material
      • OKKN: Maintain Costing Versions
    • Documentation: Refer to SAP Help documentation for detailed steps on creating and managing cost estimates.

    • User Roles: Ensure that you have the necessary authorizations to create or modify cost estimates and material master data.

    By following these steps, you should be able to identify the cause of the KV154 error and implement the appropriate solution.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:
  • KV153 Order does not exist
    What causes this issue? Th order you entered does not exist in the system.System Response The system issues an error message and will not allow you ...

  • KV152 Order (item) has no material
    What causes this issue? The settings in Customizing require the <DS:GLOS.target_costs>target costs</>, <DS:GLOS.work_in_process>wor...

  • KV155 Cost estimate with key & does not exist
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • KV156 No delivery for the material
    What causes this issue? <DS:GLOS.target_costs>Target costs</> are calculated on the basis of the actual quantity for each object. However...

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker