How To Fix KQ312 - Maintenance after deactivating &1 makes cost estimates incomparable


KQ312 - Overview

  • Message type: E = Error

  • Message class: KQ - Error Messages for Customizing Product Costing

  • Message number: 312

  • Message text: Maintenance after deactivating &1 makes cost estimates incomparable

  • Show details Hide details
  • What causes this issue?

    If cost estimates for cost component structure &v1& have been saved,
    the following actions will result in a structure break in the update of
    the cost component splits (cost component itemization):

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    Changing cost components
    Deleting cost components
    Deleting cost component structures
    Changing the assignment of cost elements to the cost components
    Changing the assignment of the cost component structure to the
    organizational units
    Changing the transfer structure
    Cost estimates updated before the change will then no longer be
    comparable with cost estimates updated after the change.

    How to fix this error?

    You can create new cost components for a cost component structure or
    change cost components from "variable" to "fixed and variable" without
    restrictions.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KQ312 - Maintenance after deactivating &1 makes cost estimates incomparable ?
    The SAP error message KQ312 indicates that there is an issue with cost estimates in the system after deactivating a particular maintenance activity or function. This error typically arises in the context of cost accounting and controlling, particularly when dealing with cost estimates for materials or production processes.
    
    Cause: The error message KQ312 is triggered when a cost estimate is being compared or processed after a maintenance activity has been deactivated. This can happen for several reasons: Deactivation of Costing Variants: If a costing variant or a specific costing method has been deactivated, any cost estimates that were created using that variant may become invalid or incomparable. Changes in Master Data: Changes in the master data (like material master, BOM, routing, etc.) that affect cost estimates can lead to this error if the relevant data is no longer available or has been altered. Inconsistent Costing Data: If there are inconsistencies in the costing data due

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker