Do you have any question about this error?
Message type: E = Error
Message class: KQ - Error Messages for Customizing Product Costing
Message number: 309
Message text: Only variable or full costs (fixed/variable) may go into the valuation
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
KQ309
- Only variable or full costs (fixed/variable) may go into the valuation ?The SAP error message KQ309, which states "Only variable or full costs (fixed/variable) may go into the valuation," typically occurs in the context of cost accounting and product costing within SAP. This error indicates that there is an issue with the cost component structure or the valuation method being used for a particular material or product.
Cause:
- Incorrect Costing Variant: The costing variant being used may not be set up correctly to allow for the type of costs being assigned (e.g., it may not allow for certain fixed costs).
- Cost Component Structure: The cost component structure may not be configured to include the necessary cost elements or may be incorrectly defined.
- Valuation Method: The valuation method used for the material may not be compatible with the type of costs being applied (e.g., using a method that does not support fixed costs).
- Material Master Data: The material master data may not be set up correctly, particularly in the costing view, which can lead to this error.
- Costing Run Issues: If you are running a costing run, there may be inconsistencies in the data being processed.
Solution:
- Check Costing Variant: Review the costing variant settings in the configuration (Transaction code: OKKN) to ensure that it allows for the type of costs you are trying to use.
- Review Cost Component Structure: Go to the cost component structure (Transaction code: OKTZ) and ensure that it includes the necessary cost elements and is correctly defined.
- Validate Valuation Method: Ensure that the valuation method used for the material is appropriate for the costs being applied. You can check this in the material master under the costing view.
- Examine Material Master Data: Check the material master data (Transaction code: MM03) to ensure that the costing view is correctly set up and that all necessary fields are filled out.
- Run Consistency Checks: If you are running a costing run, perform consistency checks to identify any issues with the data being processed.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the error and the configuration settings.
Related Information:
By following these steps, you should be able to identify the root cause of the KQ309 error and implement the necessary changes to resolve it.
Get instant SAP help. Start your 7-day free trial now.
KQ308
Costs relevant to stock valuation always rolled up
What causes this issue? Costs that are relevant to stock valuation must be rolled up. For this cost component you must specify that the costing resul...
KQ307
CComp must be assigned only to cost of goods mfd or only to S+D costs
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KQ310
Interval [&,&] overlaps with [&,&]
What causes this issue? The new cost element to be defined [&v1&,&V2&] overlaps cost element interval [&V3&,&V4&]. Th...
KQ311
Cost component structure active. Changes cause inconsistencies -> F1
What causes this issue? Changes in the cost assignment of an active cost component structure will result in a structural interruption in the update o...
Click on this link to search all SAP messages.