How To Fix KQ249 - Valuation view of costing variant &1 different from leading valuation


KQ249 - Overview

  • Message type: E = Error

  • Message class: KQ - Error Messages for Customizing Product Costing

  • Message number: 249

  • Message text: Valuation view of costing variant &1 different from leading valuation

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KQ249 - Valuation view of costing variant &1 different from leading valuation ?
    The SAP error message KQ249 indicates that there is a discrepancy between the valuation view of the costing variant and the leading valuation in the system. This typically occurs during the process of creating or changing a costing variant in the Controlling (CO) module, particularly in Product Costing.
    
    Cause: The error arises when the valuation view defined in the costing variant does not match the leading valuation view set in the system. This can happen due to several reasons, including:
    Configuration Issues: The costing variant may be configured incorrectly, leading to a mismatch with the leading valuation. Changes in Valuation Views: If there have been recent changes to the valuation views or the costing variant settings, it may lead to inconsistencies. Master Data Issues: The material master data or other related master data may not be aligned with the expected valuation views.
    Solution: To resolve the KQ249 error, you can follow these steps: Check Costing Variant Configuration: Go to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant