How To Fix KQ109 - Total percentage for OC and PC cannot be larger than 100


KQ109 - Overview

  • Message type: E = Error

  • Message class: KQ - Error Messages for Customizing Product Costing

  • Message number: 109

  • Message text: Total percentage for OC and PC cannot be larger than 100

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KQ109 - Total percentage for OC and PC cannot be larger than 100 ?
    The SAP error message KQ109, which states "Total percentage for OC and PC cannot be larger than 100," typically occurs in the context of cost planning or budgeting within SAP, particularly when dealing with overhead costs (OC) and planned costs (PC) in a project or cost center.
    
    Cause: This error arises when the sum of the percentages allocated to overhead costs (OC) and planned costs (PC) exceeds 100%. In SAP, the system enforces this rule to ensure that the total allocation of costs does not exceed the total available budget or resources.
    Solution: To resolve this error, you should: Review Cost Allocations: Check the cost allocation entries for the relevant project or cost center. Ensure that the combined percentage of OC and PC does not exceed 100%. Adjust Percentages: If the total percentage exceeds 100%, you will need to adjust the percentages. This could involve: Reducing the percentage allocated to either OC or PC. Reassessing the budget or

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant