Message type: E = Error
Message class: KPU1 - Messages: Planning Utilities 1 / 2
Message number: 015
Message text: Test run of integrated planning was completed successfully
The activation of plan integration, that is, the transfer of existing
line items or created delta line items to the accounting interface, was
successfully completed <ZH>without an update</>.
Error message extract from SAP system. Copyright SAP SE.
KPU1015
- Test run of integrated planning was completed successfully ?The SAP error message KPU1015 indicates that a test run of integrated planning was completed successfully. This message is not actually an error but rather an informational message that indicates that the test run has been executed without any issues.
Cause: The message is generated when you execute a test run for integrated planning in SAP, and the system successfully completes the process without encountering any errors. It serves as a confirmation that the planning process can proceed without issues.
Solution: Since KPU1015 is an informational message, no action is required if the test run was intended to be successful. However, if you were expecting an error or if the test run was not supposed to complete successfully, you should: Review the planning settings and parameters to ensure they are configured correctly. Check the logs for any warnings or other messages that might indicate potential issues. If you need to perform a real run, proceed with
Get instant SAP help. Sign up for our Free Essentials Plan.
KPU1014
Messages have occurred during integrated planning
What causes this issue? Messages have been issued when you activated integrated planning. This indicates that the transaction could not be executed c...
KPU1013
Plan data exists, but the version is currently locked
What causes this issue? In controlling area &V1& you want to activate integrated planning for version &V2& in fiscal year &V3&...
KPU1030
******* Messages for K_PLANVERSION_DELETE ************
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KPU1031
The planning data not been fully deleted (&4)
What causes this issue? You tried to process version &V2& in controlling area &V1&. The system has determined that data for this vers...
Click on this link to search all SAP messages.