How To Fix KPN077 - No WBS elements have been created for the project yet


SAP Error Message - Details

  • Message type: E = Error

  • Message class: KPN - Costing: Networks, Projects

  • Message number: 077

  • Message text: No WBS elements have been created for the project yet

  • Show details Hide details
  • What causes this issue?

    You have not yet maintained any WBS elements for the project. You can
    onjly maintain costings for WBS elements.

    System Response

    The system cannot create a costing.

    How to fix this error?

    Create WBS elements for the project.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KPN077 - No WBS elements have been created for the project yet ?

    The SAP error message KPN077, which states "No WBS elements have been created for the project yet," typically occurs in the context of project management within SAP, particularly when dealing with Project System (PS) modules. This error indicates that the system is unable to find any Work Breakdown Structure (WBS) elements associated with the specified project.

    Cause:

    1. No WBS Elements Created: The most straightforward cause is that no WBS elements have been created for the project in question. WBS elements are essential for project planning and execution, as they break down the project into manageable components.
    2. Incorrect Project Number: The project number entered may be incorrect or does not exist in the system.
    3. Project Status: The project may be in a status that does not allow for the creation of WBS elements.
    4. Authorization Issues: The user may not have the necessary permissions to view or create WBS elements for the project.

    Solution:

    1. Create WBS Elements:

      • Navigate to the Project Builder (transaction code CJ20N or CJ01).
      • Select the project in question and create the necessary WBS elements.
      • Ensure that the WBS elements are structured correctly according to the project requirements.
    2. Verify Project Number:

      • Double-check the project number you are using to ensure it is correct and exists in the system.
    3. Check Project Status:

      • Review the project status to ensure it is active and allows for the creation of WBS elements. You can check this in the project definition.
    4. Authorization Check:

      • Ensure that you have the necessary authorizations to create or view WBS elements. If not, contact your SAP security administrator to obtain the required permissions.
    5. Consult Documentation:

      • Review any relevant project documentation or guidelines that may provide insights into the expected structure and requirements for WBS elements.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CJ01 (Create WBS), and CJ02 (Change WBS).
    • SAP Notes: Check SAP Notes for any known issues or updates related to this error message.
    • Training and Support: If you are new to SAP Project System, consider seeking training or support from experienced colleagues or SAP consultants.

    By following these steps, you should be able to resolve the KPN077 error and successfully create or manage WBS elements for your project.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker