Do you have any question about this error?
Message type: E = Error
Message class: KPC_XI_PROXY - Message Class for KPC_XI_PROXY
Message number: 009
Message text: Cost Element &1 is not valid in Controlling Area &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
KPC_XI_PROXY009
- Cost Element &1 is not valid in Controlling Area &2 ?The SAP error message KPC_XI_PROXY009 indicates that a specified cost element is not valid in the specified controlling area. This error typically arises in the context of controlling (CO) when trying to post costs or perform transactions that involve cost elements.
Cause:
- Invalid Cost Element: The cost element specified in the transaction does not exist or is not defined in the controlling area you are working with.
- Cost Element Not Active: The cost element may exist but is not active for the controlling area.
- Incorrect Configuration: There may be a configuration issue where the cost element is not assigned to the controlling area.
- Data Entry Error: There could be a typographical error in the cost element code entered in the transaction.
Solution:
- Check Cost Element: Verify that the cost element exists in the system. You can do this by navigating to the cost element master data in SAP (Transaction Code: KA03).
- Check Controlling Area: Ensure that the cost element is assigned to the correct controlling area. You can check this in the cost element master data.
- Activate Cost Element: If the cost element is inactive, you may need to activate it for the controlling area. This can be done in the cost element master data.
- Correct Data Entry: Double-check the cost element code entered in the transaction for any typographical errors.
- Consult Configuration: If you have access, check the configuration settings in the controlling area to ensure that the cost element is properly configured and assigned.
Related Information:
If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or refer to SAP documentation for further troubleshooting steps.
Get instant SAP help. Start your 7-day free trial now.
KPC_XI_PROXY008
Select either by FundsManagement or CostElement
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KPC_XI_PROXY007
Select eithe by CostControllingLiquidityReportingStructure or CostElement
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KPEP000
*** Schedule Manager messages ***
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KPEP001
No authorization to display the log
What causes this issue? You do not have authorization to display the selected data.System Response Further processing is not possible.How to fix thi...
Click on this link to search all SAP messages.