Do you have any question about this error?
Message type: E = Error
Message class: KO - Master data for CO orders
Message number: 303
Message text: Start date is in the past
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
KO303
- Start date is in the past ?The SAP error message KO303, which states "Start date is in the past," typically occurs in the context of controlling (CO) or project management (PS) modules when you are trying to create or modify a cost center, internal order, or project with a start date that is earlier than the current date.
Cause:
- Incorrect Date Entry: The most common cause is that the start date you have entered for the cost object (like an internal order or project) is set to a date that has already passed.
- System Settings: The system may have settings that prevent the creation of cost objects with past start dates to ensure data integrity and accurate reporting.
- Project Lifecycle: In project management, it is often required that projects start in the future to align with planning and resource allocation.
Solution:
- Change the Start Date: The simplest solution is to modify the start date to a future date. Ensure that the date you enter is today or later.
- Check Configuration: If you believe the date should be valid, check the configuration settings in your SAP system. There may be specific settings that restrict the use of past dates.
- Consult Documentation: Review any relevant documentation or guidelines for your organization regarding project or order creation to ensure compliance with internal policies.
- User Authorization: Ensure that you have the necessary permissions to create or modify the cost object. Sometimes, restrictions may be in place based on user roles.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant for further assistance.
Get instant SAP help. Start your 7-day free trial now.
KO302
Material & does not exist in plant &; check your entry
What causes this issue? Material &v1& does not have a valid material master in plant &v2&. To create a CO production order for this ...
KO301
Plant & does not exist; check your entry
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KO304
& is after valid period on the factory calendar
What causes this issue? You have entered a date which lies outside the appropriate validity period.System Response The system issues an error messag...
KO305
& is before valid period on the factory calendar
What causes this issue? You have entered a date which lies outside the appropriate validity period.System Response The system issues an error messag...
Click on this link to search all SAP messages.