Message type: E = Error
Message class: KM - Error messages for Profit Center Accounting
Message number: 410
Message text: Controlling area & is incomplete
Controlling area &V1& has not been maintained completely. You can only
enter control parameters for actual postings if the following are
defined for the controlling area:
Dummy profit center
Standard hierarchy
Currency type
You cannot create new entries.
Define the above parameters for controlling area &V1&.
To do this, see <DS:SIMG.SIMG_CFMENUORK10KE5>Controlling area</>
in Customizing for Profit Center Accounting.
Error message extract from SAP system. Copyright SAP SE.
KM410
- Controlling area & is incomplete ?The SAP error message KM410 indicates that the controlling area you are trying to use is incomplete. This typically means that certain required settings or configurations for the controlling area have not been completed, which prevents you from performing certain operations related to controlling (CO) in SAP.
Cause: The error can occur due to several reasons, including: Missing Configuration: The controlling area may not have been fully configured. This includes missing settings for cost elements, cost centers, internal orders, or profit centers. Inconsistent Data: There may be inconsistencies in the data related to the controlling area, such as missing master data or incorrect assignments. Inactive Status: The controlling area might be set to inactive or not properly assigned to the company code. Authorization Issues: Sometimes, the user may not have the necessary authorizations to access or use the controlling area.
Solution: To resolve the KM410 error, you can follow these steps: Check Configuration: Go to the SAP Customizing Implementation Guide
Get instant SAP help. Sign up for our Free Essentials Plan.
KM409
No authorization for function: &1
What causes this issue? You do not have authorization for the function: &V1& in the responsibility area: The system issues an error message a...
KM408
No profit center groups exist for the transport
What causes this issue? No profit center groups have been created whose top node is not the same as that of the standard hierarchy. For each group fo...
KM411
The name & has already been used
What causes this issue? The name &V1& is already being used for the standard hierarchy in controlling area &V2&. The name must be uni...
KM412
You have not made an entry in all the required fields
What causes this issue? You must make an entry in the fields Standard hierarchy Currency type for each controlling area. If these fields are not all ...
Click on this link to search all SAP messages.