Do you have any question about this error?
Message type: E = Error
Message class: KM - Error messages for Profit Center Accounting
Message number: 089
Message text: Profit center &1 is locked in controlling area &2
The profit center is currently locked. The lock indicator has been
turned on for the relevant time frame in the profit center master
record.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
If you still want to post the data to this profit center, you need to
unlock the profit center.
Error message extract from SAP system. Copyright SAP SE.
KM089
- Profit center &1 is locked in controlling area &2 ?The SAP error message KM089 indicates that a profit center is locked in a specific controlling area. This typically occurs when there are ongoing processes or transactions that prevent changes to the profit center, such as:
Cause:
- Locked Profit Center: The profit center is locked due to ongoing transactions or processes, such as period-end closing activities.
- User Lock: A user may have locked the profit center for editing or posting.
- Configuration Issues: There may be configuration settings that prevent changes to the profit center.
- Authorization Issues: The user may not have the necessary authorizations to access or modify the profit center.
Solution:
- Check Lock Status: Use transaction code
SM12
to check for any user locks on the profit center. If a lock is found, it can be released if it is safe to do so.- Review Period-End Closing: Ensure that the period-end closing activities are completed. If the profit center is locked due to these activities, you may need to wait until they are finished.
- Check Configuration: Review the configuration settings in the controlling area to ensure that the profit center is not set to be locked for any reason.
- Authorization Check: Verify that the user has the necessary authorizations to access and modify the profit center. This can be done through transaction code
SU53
to check for authorization failures.- Contact SAP Support: If the issue persists and you cannot identify the cause, consider reaching out to SAP support for further assistance.
Related Information:
SM12
: To check and manage user locks.SU53
: To analyze authorization issues.KOB1
: To view document postings related to the profit center.By following these steps, you should be able to identify the cause of the KM089 error and take appropriate action to resolve it.
Get instant SAP help. Start your 7-day free trial now.
KM088
No valid company codes exist
What causes this issue? There is no company code for which both the profit center and joint venture are active.How to fix this error? RESET N1 Check...
KM087
You are not authorized to maintain the assignment
What causes this issue? You are not authorized to assign representative materials.How to fix this error? To perform this action, you need authorizat...
KM090
Profit Center Accounting is locked in year &, controlling area &
What causes this issue? Profit Center Accounting was locked for posting in Customizing. The system issues an error message and will not allow you to ...
KM091
Origin object is not known in Profit Center Accounting
What causes this issue? The program tried to transfer an object of unknown origin to Profit Center Accounting.System Response The program terminated...
Click on this link to search all SAP messages.